Angeles Electric
- Regional Power Distribution Utility And Energy Service Provider
- System Size: 16.80 kWp
- Completion: 14-Feb-2018
- Angeles City, Pampanga, Philippines
Project Summary
Angeles Electric Corporation, one of the leading utilities in Central Luzon, selected Solaren to install a high-quality grid-tied solar power system at its substation in Angeles City. The project serves as a demonstration of the utility’s commitment to green and renewable energy while maintaining operational reliability. The system uses premium components and precise engineering to ensure consistent performance under critical load conditions. By investing in solar power for its own facility, Angeles Electric shows leadership in promoting sustainable practices within the power sector and sets a strong example for both commercial and public institutions in the region.
System Performance
- System Size: 16.80 kWp
- Annual Generation: 24,780 kWh
- Day Peak Load: 14.28 kW
- Payback/ROI: 4.0 years
Financial Impact
- Daily Savings: ₱757
- Monthly Savings: ₱22,715
- Annual Savings: ₱272,580
- Lifetime Savings: ₱7,024,974
Technology Partners
- Inverters: SMA Germany SB5.0 x 3
- Modules: SolarWorld Germany Bifacial Glass/Glass
- Monitoring and Control: SMA ennexOS / Sunny Portal
Sustainability Impact
- TREES Planted Lifetime: 818
- CO₂ Lifetime: 347 tons
- Houses Powered Annually: 10