Golden Crown
- Confectionery Manufacturing Plant
- System Size: 41.58 kWp
- Completion: 19-Oct-2021
- Tarlac City, Tarlac, Philippines
Project Summary
Golden Crown has established its reputation through the manufacture of high-quality confectionery, specializing in cake decorations that are sold to customers globally. Everything in this industry revolves around accuracy and uniformity; a single incident of power interruption can impact sensitive production batches and quality. Golden Crown resorted to solar energy to protect quality and minimize costs. The new PV system will provide clean energy to serve the manufacturing process, sales, and the company’s administrative offices. To management, the investment is not only a savings on electricity, but it also assures that operations are running smoothly and sustainably, day after day. Pairing craftsmanship and renewable energy will strengthen Golden Crown as a reliable food supplier in the international market.
System Performance
- System Size: 41.58 kWp
- Annual Generation: 61,331 kWh
- Day Peak Load: 35.34 kW
- Payback/ROI: 5.2 years
Financial Impact
- Daily Savings: ₱1874
- Monthly Savings: ₱56,220
- Annual Savings: ₱674,636
- Lifetime Savings: ₱17,386,810
Technology Partners
- Inverters: SMA Germany SB6.0 x 6
- Modules: Trina Solar Vertex
- Monitoring and Control: SMA ennexOS / Sunny Portal
Sustainability Impact
- TREES Planted Lifetime: 2,024
- CO₂ Lifetime: 859 tons
- Houses Powered Annually: 26