Liwayway Marketing Corporation (Oishi) Phase 4A
- Large-Scale Food Plant Protecting Uptime
- System Size: 1532.05 kWp
- Completion: 1-Jul-2026
- Imus, Cavite, Philippines
Project Summary
Oishi’s 1,532.05 kWp Phase 4A installation in Imus follows a principle developed through Solaren’s phased industrial solar programme for Liwayway: size each addition around the factory load it will serve. The zero-export system prioritises direct consumption and limits unnecessary curtailment. Huawei SUN2000-150K-MG0 string inverters also diversify the equipment used across the growing solar estate, while further expansion remains tied to suitable roof areas and operating demand.
Solaren’s work at the Imus manufacturing complex forms an ongoing multi-phase programme. Each stage is sized against the load of the factory section it serves, with additional roof areas assessed as the facility develops.
System Performance
- System Size: 1532.05 kWp
- Annual Generation: 2,259,774 kWh
- Day Peak Load: 1302.24 kW
- Payback/ROI: 3.1 years
Financial Impact
- Daily Savings: ₱69,049
- Monthly Savings: ₱2,071,459
- Annual Savings: ₱24,857,511
- Lifetime Savings: ₱640,631,614
Technology Partners
- Inverters: Huawei SUN2000-150K-MG0
- Modules: LONGI Scientist 650W
- Monitoring and Control: Huawei FusionSolar
Sustainability Impact
- TREES Planted Lifetime: 74,573
- CO₂ Lifetime: 31,637 tons
- Houses Powered Annually: 942











