Golden Crown
- Confectionery Manufacturing Plant
- System Size: 41.58 kWp
- Completion: 19-Oct-2021
- Tarlac City, Tarlac, Philippines
Project Summary
Golden Crown has built its international reputation on precision confectionery and high-quality cake decorations supplied to global markets. In food manufacturing, consistency is critical. Even brief power interruptions can disrupt temperature-sensitive production batches, affect finishing processes, and compromise uniformity.
Solaren designed and installed a rooftop solar system carefully aligned with the company’s predominantly daytime manufacturing schedule. Because core operations run during peak sunlight hours, the majority of generated energy is consumed directly on-site. This approach reflects the same principles outlined in commercial solar installation Philippines, where proper load matching drives real financial performance.
The system has now operated flawlessly for several years, delivering consistently low electricity bills. Return-on-investment targets were achieved as projected, confirming the strength of both engineering design and financial modeling. For Golden Crown, solar is not only about reducing costs. It supports operational stability, protects production quality, and strengthens the company’s position as a dependable food supplier in competitive international markets.
System Performance
- System Size: 41.58 kWp
- Annual Generation: 61,331 kWh
- Day Peak Load: 35.34 kW
- Payback/ROI: 5.2 years
Financial Impact
- Daily Savings: ₱1874
- Monthly Savings: ₱56,220
- Annual Savings: ₱674,636
- Lifetime Savings: ₱17,386,810
Technology Partners
- Inverters: SMA Germany SB6.0 x 6
- Modules: Trina Solar Vertex
- Monitoring and Control: SMA ennexOS / Sunny Portal
Sustainability Impact
- TREES Planted Lifetime: 2,024
- CO₂ Lifetime: 859 tons
- Houses Powered Annually: 26