Moncada LGU
- Municipal Hall Rooftop System
- System Size: 91.56 kWp
- Completion: 9-Sep-2023
Project Summary
The Municipality of Moncada chose to invest in solar not as a gesture, but as infrastructure. For a local government unit, electricity is not optional. Administrative offices, public service departments, and daily operations depend on stable and predictable power. Rising utility costs directly affect municipal budgets and, by extension, the services delivered to residents.
By installing a grid-tied solar system across its primary facilities, Moncada reduced its reliance on conventional grid energy while maintaining full operational continuity. The system was engineered to support daytime administrative loads and ensure consistent performance under local distribution utility requirements. The outcome is measurable cost stability over time, without compromising service delivery.
For government projects, reliability and accreditation are not secondary considerations. They are essential. Procurement standards require technical qualifications, regulatory compliance, and a track record that can withstand public scrutiny. Partnering with a properly accredited renewable energy provider ensures that installations meet both engineering and governance standards. The broader advantages of working with an experienced and recognized renewable energy company in the Philippines are discussed here.
Beyond cost savings, the project sends a practical message to the community. Clean energy adoption at the municipal level demonstrates that sustainability and responsible governance can work together. Moncada’s installation reflects a forward-looking approach to energy management, positioning the LGU as a steady and credible example within Central Luzon.
System Performance
- System Size: 91.56 kWp
- Annual Generation: 135,051 kWh
- Day Peak Load: 77.83 kW
- Payback/ROI: 5.6 years
Financial Impact
- Daily Savings: ₱4,127
- Monthly Savings: ₱123,797
- Annual Savings: ₱1,485,561
- Lifetime Savings: ₱38,286,107
Technology Partners
- Inverters: SMA Germany SB6.0 x 15
- Modules: Sunova Solar Bifacial
- Monitoring and Control: SMA ennexOS / Sunny Portal
Sustainability Impact
- TREES Planted Lifetime: 4,457
- CO₂ Lifetime: 1,891 tons
- Houses Powered Annually: 56