PLERM Construction
- Construction and civil engineering contractor, JICA partner
- System Size: 11.00 kWp
- Completion: 23-May-2015
- Santa Maria, Bulacan, Philippines
Project Summary
PLERM Construction is one of Bulacan’s oldest and most respected contractors, known for its long record of dependable infrastructure and building projects, including partnerships with international development groups such as JICA. To strengthen its commitment to sustainable construction, Plerm chose Solaren to install a grid-tied solar power system at its main facility. The system uses high-quality components to provide reliable energy for daily operations, lowering electricity costs and demonstrating how traditional engineering excellence can work hand in hand with renewable energy. Through this project, Plerm Construction continues its legacy of quality while embracing cleaner, more responsible power for the future.
System Performance
- System Size: 11.00 kWp
- Annual Generation: 16,225 kWh
- Day Peak Load: 9.35 kW
- Payback/ROI: 5.5 years
Financial Impact
- Daily Savings: ₱496
- Monthly Savings: ₱14,873
- Annual Savings: ₱178,475
- Lifetime Savings: ₱4,599,685
Technology Partners
- Inverters: SMA Germany SB5.0 x 2
- Modules: SolarWorld Germany Bifacial Glass/Glass
- Monitoring and Control: SMA ennexOS / Sunny Portal
Sustainability Impact
- TREES Planted Lifetime: 535
- CO₂ Lifetime: 227 tons
- Houses Powered Annually: 7