Sun Garden Hotel Phase II BESS

Project Summary

Sun Garden Hotel in Tarlac City has expanded its existing SMA grid-tied solar installation with a 286 kWh Battery Energy Storage System (BESS), using Sunsynk three-phase hybrid inverter technology.

 

Rather than replace the existing SMA equipment, Solaren selected AC coupling through the Sunsynk GEN ports, redirecting surplus solar production from grid export into battery storage.

 

Carefully sized against the hotel’s established electrical loads, the BESS is programmed for peak shaving, reducing expensive maximum-demand charges while supplying stored solar energy during evening and overnight operations. During grid failures, the system supports designated hotel loads and automatically starts the generator when required.

 

The project is designed to deliver substantial electricity bill reductions, with the possibility of approaching zero under favourable operating conditions.

 

Related Solaren Projects and Technical Articles

System Performance

Financial Impact

Technology Partners​

Sustainability Impact

Other Projects

Check out our other projects! Unlock the potential of solar energy with our range of innovative solar panel projects
THE SMART INVESTMENT FOR YOUR HOME OR BUSINESS

SWITCH TO SOLAR PV!

We take pride in providing cutting-edge technology and expertise to help our clients power the future with clean, sustainable energy.
solar energy
Renewable Energy Solutions

GET A QUOTE