Sun Garden Hotel Phase II BESS
- BESS Retrofit with Backup Power
- System Size: 136.04 kWp
- Completion: 3-Sep-2026
Project Summary
Sun Garden Hotel in Tarlac City has expanded its existing SMA grid-tied solar installation with a 286 kWh Battery Energy Storage System (BESS), using Sunsynk three-phase hybrid inverter technology.
Rather than replace the existing SMA equipment, Solaren selected AC coupling through the Sunsynk GEN ports, redirecting surplus solar production from grid export into battery storage.
Carefully sized against the hotel’s established electrical loads, the BESS is programmed for peak shaving, reducing expensive maximum-demand charges while supplying stored solar energy during evening and overnight operations. During grid failures, the system supports designated hotel loads and automatically starts the generator when required.
The project is designed to deliver substantial electricity bill reductions, with the possibility of approaching zero under favourable operating conditions.
Related Solaren Projects and Technical Articles
System Performance
- System Size: 136.04 kWp
- Annual Generation: 200,659 kWh
- Day Peak Load: 115.63 kW
- Payback/ROI: 2.2 years
Financial Impact
- Daily Savings: ₱6,131
- Monthly Savings: ₱183,937
- Annual Savings: ₱2,207,249
- Lifetime Savings: ₱56,885,562
Technology Partners
- Inverters: SUNSYNK-80K + 315kWh BESS
- Modules: Trina Solar Glass Glass Bifacial
- Monitoring and Control: Sunsynk Connect
Sustainability Impact
- TREES Planted Lifetime: 6,622
- CO₂ Lifetime: 2,809 tons
- Houses Powered Annually: 84