Call Us

0917 879 6037

Send Mail

sales@solaren-power.com

Five Star Bus Terminal

Five Star Bus Terminal

Five Star Bus Terminal Public transport terminal with food and passenger facilities System Size: 54.00 kWp Completion: 6-Jun-2023 La Paz, Tarlac, Philippines Project Summary Five Star Bus Terminal is one of the busiest intercity transport hubs in Central Luzon, operating around the clock and serving a continuous flow of passengers,…
Romarosa

Romarosa

Romarosa Poultry Farm with Tunnel Ventilation System Size: 99.62 kWp Completion: 1-Jun-2023 Tanay, Rizal, Philippines Project Summary Romarosa operates large-scale poultry houses where flock health depends on continuous airflow, controlled lighting, and stable environmental conditions. Ventilation fans, cooling pads, and automated controllers draw significant power during the hottest parts of…
J Poon Realty

J Poon Realty

J Poon Realty Storage and Processing Warehouse + Offices System Size: 200.56 kWp Completion: 18-May-2023 Calamba, Laguna, Philippines Project Summary Poon Realty is the property and infrastructure arm behind Atlantic Grains, one of the Philippines’ largest food supply networks. The Calamba facility handles storage, processing, and distribution at scale, with…
Lee Residence

Lee Residence

Lee Residence Large-Scale Residential Solar Complex System Size: 19.62 kWp Completion: 15-May-2023 San Sebastian, Tarlac City, Philippines Project Summary The Lee Residence features a 19.62 kWp fully net-metered solar installation designed to serve both household consumption and electric vehicle charging. The architectural centrepiece is a custom-built solar canopy, engineered not…
El Cabalen (Phase II)

El Cabalen (Phase II)

El Cabalen (Phase II) Hotel Facility With Stable Low-Cost Power System Size: 46.89 kWp Completion: 5-May-2023 Tarlac City, Philippines Project Summary Hotels live and die by their operating cost structure. Air conditioning runs around the clock, lighting covers guest rooms, corridors, dining areas, and function spaces, and the expectation of…
Aguda Residence

Aguda Residence

Aguda Residence Grid-Tied Solar with Full Daytime Offset System Size: 10.50 kWp Completion: 18-Mar-2023 White Plains, Quezon City, Philippines Project Summary Not every solar installation is a rooftop job. At the Aguda residence in White Plains, Quezon City, the brief called for something more considered: a pergola-mounted system that integrates…
Dr. LPA Concepcion Eye Clinic

Dr. LPA Concepcion Eye Clinic

Dr. LPA Concepcion Eye Clinic Eye Clinic With Constant Daytime Loads System Size: 16.90 kWp Completion: 11-Jan-2023 Tarlac City, Philippines Project Summary A medical clinic runs differently from most commercial buildings. The doors open early, the air conditioning runs from the first patient to the last, and there is no…
BHF Appliances, Gapan

BHF Prime Group Corporation (Gapan)

BHF Prime Group Corporation (Gapan) Appliance Retailer and Pawnshop System Size: 14.17 kWp Completion: 29-Dec-2022 Gapan, Nueva Ecija, Philippines Project Summary BHF has been running solar across its Northern Luzon network long enough to know exactly what it delivers. When the Gapan branch needed a system, the decision was straightforward:…
Gene Residence

Gene Residence

Gene Residence Zero-Billing Solar Carport Powers Entire Home System Size: 15.26 kWp Completion: 14-Dec-2022 Concepcion, Tarlac, Philippines Project Summary For a professional couple building their family home from scratch in Concepcion, Tarlac, the brief had two requirements: zero billing, and nothing on the main roof. The carport solved both. Solaren…
Tarlac Contractors

Probuild Tarlac

Probuild Tarlac Construction Company Offices and Storage System Size: 26.16 kWp Completion: 14-Dec-2022 Conception, Tarlac, Philippines Project Summary Construction company overheads are relentless. Office staff, engineers, logistics coordinators, and project managers running air conditioning, computer systems, and communications equipment across a busy Tarlac facility means the electricity meter never stops.…
Rivera

Rivera Residence

Rivera Residence Residential Solar for Day Use and Export Offset System Size: 26.16 kWp Completion: 14-Dec-2022 Concepcion, Tarlac, Philippines Project Summary This modern bungalow was designed from the outset to take full advantage of solar generation during the day and grid interaction. The residence features a clean, integrated grid-tied solar…
KKK

KKK Turbo Fuel Corporation (San Nicolas)

KKK Turbo Fuel Corporation (San Nicolas) Gasoline Station Network System Size: 72.75 kWp Completion: 6-Nov-2022 Tarlac City, Tarlac, Philippines Project Summary San Nicolas is one of the busiest commercial forecourts in the KKK network. Beyond fuel operations, the site carries a wide mix of tenants: convenience retail, food outlets, and…
Cojuangco

Cojuangco Residence

Cojuangco Residence Heritage Home Grid-Tied Solar Upgrade System Size: 25.70 kWp Completion: 20-Oct-2022 Paniqui, Tarlac, Philippines Project Summary This premium residential installation was designed with a clear objective: reduce grid dependence and stabilize long-term household energy costs in a highly volatile utility environment. The property sits in an area where…
Creston Academy

Creston Academy

Creston Academy Private School Rooftop Installation System Size: 45.78 kWp Completion: 9-Oct-2022 Tarlac City, Tarlac, Philippines Project Summary Creston Academy is one of the region’s most respected private schools, known for high academic standards and disciplined institutional leadership. With classrooms, laboratories, offices, and shared learning spaces operating throughout the day,…
Sytu Residence

Sytu Residence

Sytu Residence Subdivision residence equipped with a full offset solar setup ensuring consistent zero monthly electricity cost. System Size: 6.54 kWp Completion: 30-Sep-2022 Camella, Tarlac City, Philippines Project Summary This modern subdivision residence operates on a full-offset Solaren single-phase solar installation engineered to achieve genuine zero billing under net metering.…
Miranda's Residence

Miranda’s Residence

Miranda’s Residence VIP Residence Premium Grid-Tied Solar Installation with zero billing System Size: 13.08 kWp Completion: 29-Sep-2022 San Sebastian, Tarlac, Philippines Project Summary For a well-known personality in San Sebastian, Tarlac, the decision to install solar was straightforward: protect a premium home from rising grid costs while using the best…
RMCT

RMCT

RMCT Mixed-Use Commercial Building System Size: 19.62 kWp Completion: 23-Sep-2022 Tarlac City, Philippines Project Summary Mixed-use commercial buildings in Philippine town centres run a broad and consistent load profile. At RMCT’s Tarlac City property, ground-floor retail, upper-level offices, storage areas, and workspace operations collectively draw on lighting, ventilation, refrigeration, and…
Northeastern Colleges

Northeastern Colleges

Northeastern Colleges Multi-Building School Solar Deployment System Size: 99.99 kWp Completion: 13-Sep-2022 Santiago City, Isabella, Philippines Project Summary Northeastern Colleges is a long-established educational institution in Santiago City, recognized for its academic standards and well-developed campus facilities. As the campus expanded, electricity demand grew beyond classrooms and administrative buildings to…
Royal Crown

Royal Crown

Royal Crown Contractor with Heavy Equipment & Field Sites System Size: 52.32 kWp Completion: 3-Sep-2022 Tarlac City, Tarlac, Philippines Project Summary Royal Crown is a construction and engineering contractor operating from a busy office and yard, coordinating active projects, logistics, and regional site operations. Daily electricity demand is driven by…
Hamilton's Restaurant

Hamilton’s Restaurant

Hamilton’s Restaurant Solar-Powered Restaurant with Outdoor Dining System Size: 26.16 kWp Completion: 17-Aug-2022 La Paz, Tarlac, Philippines Project Summary Hamilton Restaurant is one of Tarlac’s most recognized event venues, known for premium dining, weddings, and large community gatherings. Operating a busy restaurant and function space requires substantial electricity, from commercial…
Kabayan Hotel

Kabayan Hotel

Kabayan Hotel Urban Tourist Hotel Solar System Size: 198.00 kWp Completion: 22-Jul-2022 Pasay, NCR, Philippines Project Summary Kabayan Hotel is one of Metro Manila’s most recognised affordable hospitality brands, operating in the heart of Pasay with a mix of local and international guests and a continuous load that a busy…
Hansen

Hansen’s Residence

Hansen’s Residence Legacy Grid-Tied Home Solar – Fully Operational System Size: 5.52 kWp Completion: 20-Jul-2012 Sta Monica Heights, Tarlac City, Philippines Project Summary For a retired family in Sta. Monica Heights, Tarlac City, electricity bills on a fixed income are not a minor inconvenience. They are a monthly pressure that compounds…
Kayrilaw

Kayrilaw

Kayrilaw Organic Farm – Off-Grid Solar and Storage Pilot System Size: 28.90 kWp Completion: 1-Jul-2022 Nasugbu, Batangas, Philippines Project Summary Kayrilaw is an organic agricultural farm located in the remote highlands between Nasugbu and Cavite, where grid power is intermittent, unstable, and frequently unavailable. Reliable electricity is essential for daily…
KKK Office

KKK Turbo Fuel Corporation (Office)

KKK Turbo Fuel Corporation (Office) Admin Office Tied to Gasoline Network System Size: 54.45 kWp Completion: 12-Jun-2022 Tarlac City, Tarlac, Philippines Project Summary The KKK Office operates as the administrative headquarters for a growing network of gasoline stations and retail outlets. From accounting and scheduling to logistics and inter-branch coordination,…
Servitek

Servitek

Servitek Car Maintenance Shop with Daylighting + PV System Size: 24.75 kWp Completion: 9-Jun-2022 Tarlac City, Tarlac, Philippines Project Summary Servitek operates a busy automotive service workshop known for consistent vehicle care and high customer throughput. Daily operations rely on uninterrupted power for diagnostic equipment, tools, lighting, ventilation, and customer-facing…
New World Trading

New World Trading

New World Trading Supermarket & Grocery Solar Site System Size: 20.79 kWp Completion: 30-May-2022 Tarlac City, Tarlac, Philippines Project Summary New World Trading is a high-traffic supermarket serving a steady daily customer base. Much like most retail food environments, its electricity demand is concentrated during business hours and driven by…
Belmonte Residence

Belmonte Residence

Belmonte Residence Premium Plus Grid Tied Residential Solar System Size: 13.08 kWp Completion: 10-May-2022 Maliwalo, Tarlac, Philippines Project Summary The Belmonte Residence was designed from the outset with integrated solar planning as part of the construction process. Rather than treating solar as an afterthought, the homeowners involved Solaren during the…
El Cabalen

El Cabalen

El Cabalen Hotel and hospitality establishment System Size: 46.89 kWp Completion: 2-May-2022 San Sebastien, Tarlac City, Philippines Project Summary El Cabalen is a high-occupancy hotel in the center of Tarlac City, serving a steady flow of guests throughout the year. With guest rooms, kitchens, lighting, and common areas operating daily,…
Tarlac Mac Chicken Farm

Tarlac Mac Chicken Farm

Tarlac Mac Chicken Farm Commercial poultry and egg production facility System Size: 99.98 kWp Completion: 20-Apr-2022 De La Paz, Tarlac City, Philippines Project Summary Poultry farming runs on continuous power. Ventilation, cooling, and automated feeding systems operate around the clock, and electricity costs eat directly into margin on every bird…
Jorisan Hotel

Jorisan Hotel

Jorisan Hotel Beach Resort with Hotel Annex System Size: 14.00 kWp Completion: 13-Apr-2022 Bauang, La Union, Philippines Project Summary Jorisan Hotel is a beachfront resort in Bauang, La Union, welcoming guests to one of the most exposed coastal environments in Northern Luzon. Like most seaside hotels, energy demand is constant.…
Liwayway Marketing Corporation (Oishi) Phase 2

Liwayway Marketing Corporation (Oishi) Phase 2

Liwayway Marketing Corporation (Oishi) Phase 2 High-Consumption Snack Plant Reducing Costs System Size: 381.50 kWp Completion: 4-Apr-2022 Imus, Cavite, Philippines Project Summary Phase 1 at the Liwayway Marketing Corporation (Oishi) Imus facility performed as designed. The monitoring data was clean, the savings were tracking against projections, and the rooftop area…
Jaime Lim

Lim’s Residence

Lim’s Residence Urban Grid-Tied Solar Home System Size: 25.00 kWp Completion: 24-Mar-2022 Ayala Heights, Quezon City, Philippines Project Summary The Lim Residence in Ayala Heights sits on one of Metro Manila’s most premium ridgelines, with architecture designed to showcase the view and keep lines clean. Solaren delivered a flagship residential…
Dr. LPA Concepcion Eye Clinic

New World Trading Warehouse

New World Trading Warehouse Grocery Warehouse With EV Charging Demand System Size: 61.05 kWp Completion: 23-Mar-2022 Tarlac City, Philippines Project Summary A grocery and dry goods warehouse carries a demanding electrical load profile. Refrigeration, lighting across large floor areas, materials handling equipment, and the growing expectation of EV charging infrastructure…
Sun City Inn (Phase II)

Sun City Inn (Phase II)

Sun City Inn (Phase II) Solar expansion repaid in 2.2 years System Size: 52.20 kWp Completion: 20-Mar-2022 Tarlac City, Philippines Project Summary Sun City Inn is a working hotel in Tarlac City, the kind of hospitality load that runs air conditioning, laundry, kitchen equipment, and guest facilities through the hottest…
Jorisan Farm

Jorisan Farm

Jorisan Farm Mid-scale Poultry Facility System Size: 140.00 kWp Completion: 3-Mar-2022 Caba, La Union, Philippines Project Summary Project Summary Jorisan Poultry Farm operates as part of a growing agricultural network focused on stable, large-scale chicken production. Power demand on-site is substantial, driven by tunnel ventilation fans, evaporative cooling pads, lighting,…
Forbes Park

WK Residence

WK Residence Premium Grid-Tied Residential Solar System Size: 58.41 kWp Completion: 28-Feb-2022 Forbes Park, Makati City,NCR, Philippines Project Summary This installation is located within a highly regulated, premium residential subdivision in central Metro Manila, where compliance, aesthetics, and technical approval requirements are strictly enforced. The property features a complex roof layout…
Murray

Murray Residence

Murray Residence Grid-Tied Solar Home with Full Offset System Size: 7.00 kWp Completion: 20-Jan-2022 Mexico, Pampanga, Philippines Project Summary The Murray residence sits in Mexico, Pampanga, with Mount Arayat as its backdrop, one of the more distinctive addresses in Central Luzon. Since January 2022, it has also been one of…
Chua Residence

Chua Residence

Chua Residence Urban Grid-Tied Solar Installation with 90% bill reduction System Size: 29.26 kWp Completion: 5-Jan-2022 Quezon City, Philippines Project Summary The Chua Residence, located in a quiet subdivision in Quezon City, is a premium residential installation designed around substantial daily energy demand. The property supports both household living and…
White Residence

White Residence

White Residence Zero-Billing Dagupan Family Home System Size: 14.56 kWp Completion: 31-Dec-2021 Palmas Verdez, Dagupan,Pangasinan, Philippines Project Summary Getting to zero billing is not purely a generation problem. It requires a system that meets the specific technical requirements of the local utility, documented, inspected, and commissioned to exactly the standard…
Megasavers Office

1st Mega Savers (Office)

1st Mega Savers (Office) Administration and Back Office Solar System Size: 28.00 kWp Completion: 14-Nov-2021 Tarlac City, Tarlac, Philippines Project Summary The 1st Mega Savers main office in Tarlac City is the operational backbone of a multi-branch retail network. Purchasing, warehousing, marketing, and branch coordination all run from this facility,…
Golden Crown Thumbnail

Golden Crown

Golden Crown Confectionery Manufacturing Plant System Size: 41.58 kWp Completion: 19-Oct-2021 Tarlac City, Tarlac, Philippines Project Summary Golden Crown has built its international reputation on precision confectionery and high-quality cake decorations supplied to global markets. In food manufacturing, consistency is critical. Even brief power interruptions can disrupt temperature-sensitive production batches,…
Liwayway Marketing Corporation (Oishi) Phase 1

Liwayway Marketing Corporation (Oishi) Phase 1

Liwayway Marketing Corporation (Oishi) Phase 1 Food Plant Needing Reliable Power System Size: 235.20 kWp Completion: 6-Sep-2021 Imus, Cavite, Philippines Project Summary Liwayway Marketing Corporation (Oishi) runs one of the most energy-intensive food manufacturing operations in the Philippines. At its Imus facility in Cavite, snack production lines, packaging equipment, refrigeration,…
oishi

Liwayway Marketing Corporation (Oishi) Phase 3

Liwayway Marketing Corporation (Oishi) Phase 3 Food Manufacturing – Imus / Pasay (Multi Site) System Size: 1464.00 kWp Completion: 6-Sep-2021 Imus, Cavite, Philippines Project Summary Liwayway Marketing Corporation (Oishi) operates one of the largest snack manufacturing complexes in the Philippines at its Imus facility in Cavite. Production does not stop.…
Megasavers Cabanatuan

1st Mega Savers (Cabanatuan)

1st Mega Savers (Cabanatuan) Cabanatuan Appliance Store Rooftop System System Size: 63.36 kWp Completion: 5-Sep-2021 Cabanatuan, Nueva Ecija, Philippines Project Summary 1st Mega Savers Cabanatuan is one of the brand’s busiest retail branches, operating a large showroom with extensive lighting, illuminated displays, and continuous air-conditioning throughout trading hours. The store…
Luchangco Residence

Luchangco Residence​

Luchangco Residence Premium grid-tied solar installation delivering stable daytime power and long-term savings. System Size: 6.93 kWp Completion: 2-Sep-2021 Tarlac City, Philippines Project Summary This premium grid-tied residential installation was engineered to eliminate rising electricity costs and deliver stable, long-term performance. The homeowner, a retired balikbayan supporting extended family members…
Eriguel residence

Eriguel Residence

Eriguel Residence Grid-Tied Solar for Provincial Family Home System Size: 27.02 kWp Completion: 5-Jul-2021 Loyola Grand Village, Marikina City, Philippines Project Summary This installation in Loyola Grand Village, Marikina City was engineered as a smartly sized grid-tied solar solution tailored precisely to the homeowner’s daytime load profile. Rather than oversizing the…
Daviau

Daviau Residence

Daviau Residence Modern Class A Grid-Tied Solar Family System with zero billing System Size: 6.68 kWp Completion: 4-Dec-2020 Tagudin, Ilocos Sur, Philippines Project Summary For an expatriate family spending six months of the year abroad, a standard grid-tied solar system would generate energy with nobody home to use it. Without…
Rosario Residence

Rosario Residence

Rosario Residence OFW Engineer’s Retirement Home Maximizing Net-Metering Credits System Size: 9.79 kWp Completion: 28-Aug-2020 Tagaytay City, Philippines Project Summary The client is a Filipino engineer working in Saudi Arabia. The brief was simple: by the time he retires and comes home to Tagaytay City, he should not have to…
Rivera Agro Industrial phase 2

Rivera Agro Industrial phase 2

Rivera Agro Industrial phase 2 Large-scale hog-growing and livestock operation System Size: 100.00 kWp Completion: 21-Jul-2020 San Vincente, Bamban, Philippines Project Summary Large-scale hog farming runs on power. Climate-controlled barns, automated feeding systems, and ventilation infrastructure operate around the clock, and the electricity bill reflects it. For Rivera Agro Industrial…
Dunkin Donuts

Dunkin Donuts

Dunkin Donuts Donut Factory + Retail Stores – Multiple Sites System Size: 11.00 kWp Completion: 12-Mar-2019 Sta Maria, Bulacan, Philippines Project Summary A Dunkin’ Donuts operation is not a simple retail store. Behind the counter is a production facility running ovens, refrigeration, and distribution infrastructure that supplies an extended chain…
BIR Tarlac

BIR Tarlac

BIR Tarlac Government Office Installation System Size: 30.78 kWp Completion: 9-Jan-2019 Tarlac City, Tarlac, Philippines Project Summary The Bureau of Internal Revenue office in Tarlac serves the public daily, relying on stable electricity to support lighting, cooling systems, computer networks, and client-facing services. Peak demand occurs during daylight hours, when…
Murrell Residence

Murrell Residence

Murrell Residence Suburban Grid-Tied Solar Residential System System Size: 22.56 kWp Completion: 14-Dec-2018 San Fernando, Pampanga, Philippines Project Summary This residential installation was engineered as a fully grid-tied system designed to match daytime household demand while exporting surplus generation to SFELAPCO under net metering. From the beginning, the objective was…
Grupo Marilen

Grupo Marilen

Grupo Marilen Distribution Warehouse with Night Load System Size: 52.08 kWp Completion: 25-Sep-2018 Santiago City, Isabella, Philippines Project Summary Cold chain distribution never stops. Grupo Marilen has been supplying frozen products, dairy, meat, seafood, and fresh produce across Santiago City and the wider Isabela region since 1993, and the refrigeration,…
Victoria Industrial Park

Victoria Industrial Park

Victoria Industrial Park PEZA-registered Industrial Hub System Size: 99.98 kWp Completion: 19-Aug-2018 Victoria, Tarlac, Philippines Project Summary Victoria Industrial Park in Tarlac is one of the newest approved PEZA-registered zones in the region when Solaren installed the first system there in August 2018, and it was already clear then that…
CK Hog Farm

CK Hog Farm

CK Hog Farm Hog Grow-out Farm with Off-Grid Option System Size: 50.22 kWp Completion: 17-Aug-2018 Tanay, Rizal, Philippines Project Summary Most farm solar installations connect to a single energy source: the grid. CK Hog Farm in Tanay, Rizal presented a more complex brief. An existing biogas system was already generating…
3K Hotel

3K Hotel

3K Hotel City Hotel Rooftop System System Size: 28.56 kWp Completion: 16-Jun-2018 Santiago City, Isabella, Philippines Project Summary The 3K Hotel project demonstrates how solar can deliver strong financial returns even when roof space is constrained. As a multi-purpose hotel and function venue, the property operates with consistent occupancy across…
DPJ

DPJ

DPJ Hydro Electric Plant with Solar-Hybrid Concept System Size: 10.80 kWp Completion: 6-Jun-2017 Tabuk, Kalinga, Philippines Project Summary Most renewable energy installations solve one problem. The DPJ project in Tabuk, Kalinga, solves two simultaneously, and each solution makes the other more effective.   The site draws power from a run-of-river…
Villa Verde

Villa Verde

Villa Verde Grid-Tied Solar in Gated Community System Size: 11.20 kWp Completion: 20-Apr-2018 Pasig City, Philippines Project Summary Running a home in a gated community in Pasig City means carrying Manila electricity rates on a continuous basis. For the Villa Verde residence, that cost has not been a concern since…
Mooney Residence

Mooney Residence

Mooney Residence Hybrid Home System with Battery Storage System Size: 8.12 kWp Completion: 1-Apr-2025 Hacienda Luisita, Philippines Project Summary The Mooney Residence sits on a prime golf course property and required a system that matched both the architectural standard and the lifestyle of its owner. The brief was clear: maximise…
Angeles Electric

Angeles Electric

Angeles Electric Regional Power Distribution Utility And Energy Service Provider System Size: 16.80 kWp Completion: 14-Feb-2018 Angeles City, Pampanga, Philippines Project Summary Angeles Electric Corporation, one of the leading utilities in Central Luzon, selected Solaren to install a high-quality grid-tied solar power system at its substation in Angeles City. The…
Taytay, Freshwater Plant

Taytay, Freshwater Plant

Taytay, Freshwater Plant Rural freshwater supply and solar-powered water pumping & distribution facility System Size: 54.00 kWp Completion: 18-Jan-2018 Taytay, Palawan, Philippines Project Summary Access to clean drinking water is something most Filipinos in cities and town areas take for granted. For one remote barangay in the mountains of Palawan…
Wellissa Farm

Wellissa Farm

Wellissa Farm Hog + Poultry Farm – Integrated Solar System System Size: 47.25 kWp Completion: 8-Oct-2017 Bantayan, Cebu, Philippines Project Summary Wellissa Farm is a diversified agricultural operation combining poultry houses, layer facilities, and hog production on a single site. This mix creates a complex energy profile, with continuous ventilation…
Sun City

Sun City Inn

Sun City Inn Hotel & Leisure Property – Solar Rooftop System Size: 51.10 kWp Completion: 6-Aug-2017 Tarlac City, Tarlac, Philippines Project Summary Sun City Inn is a recreational hospitality destination where consistent power supply is essential to guest comfort, service quality, and daily operations. The property operates guest rooms, dining…
Defuntorum

Defuntorum

Defuntorum Grid-Tied Solar Setup with Night-Time Export Credit System Size: 10.62 kWp Completion: 6-Aug-2017 Anubu, Imus, Cavite, Philippines Project Summary For a new build home in Imus, Cavite, the decision was made early: design solar in from the start rather than retrofit it later. That single choice made the installation…
Sabariaga

Sabariaga Residence

Sabariaga Residence Premium Hybrid Energy Future System Size: 23.96 kWp Completion: 15-Jul-2017 St. Ignacius Quezon City, Philippines Project Summary Retirement changes the calculation. The household is home for more of the day, consumption patterns shift, and the cost of getting the system wrong compounds across a much longer horizon. For…
Dr Farrah

Dr Farrah

Dr. Farrah Natural Medical Center – Herbal Clinic + Solar System Size: 16.20 kWp Completion: 3-May-2017 Victoria, Tarlac, Philippines Project Summary The Natural Medical Center of Dr. Farrah provided integrative healthcare services in a rural setting where grid reliability was inconsistent. Treatment rooms, herbal preparation areas, cooling systems, and administrative…
Lotus tn

Lotus

Lotus Soap Manufacturing Facility System Size: 23.76 kWp Completion: 2-Apr-2017 Las Pinas, NCR, Philippines Project Summary In April 2017, Lotus Manufacturing in Las Piñas made a decision that no Philippine solar client had made before: they specified bifacial solar panels. At the time, bifacial technology was emerging but unproven in…
Tanedo Residence

Tanedo Residence

Tanedo Residence City-center home powered by a fully self-reliant grid-tied solar system that eliminates monthly bills. System Size: 5.40 kWp Completion: 2-Mar-2017 Gerona, Tarlac City, Philippines Project Summary Retirement should mean financial stability, not monthly anxiety over electricity bills. For the Tañedo family in the city center, rising grid rates…
MBP Blessed Trinity

MBP Blessed Trinity

MBP Blessed Trinity Private Hospital Rooftop System System Size: 5.70 kWp Completion: 10-Nov-2015 Mangatarem, Pangasinan, Philippines Project Summary Hospitals cannot afford power interruptions. For MBP Blessed Trinity in Mangatarem, Pangasinan, electricity supports medical equipment, patient comfort, and round-the-clock service delivery. When the hospital chose solar in November 2015, reliability was…
Pugad Adventure

Pugad Adventure

Pugad Adventure Adventure & Outdoor Recreation Park System Size: 36.36 kWp Completion: 30-Aug-2015 Pugo, La Union, Philippines Project Summary Pugad Adventure is an outdoor recreation destination where families, groups, and tourists spend extended time enjoying nature-based activities. The park operates zip lines, swimming pools, restaurants, guest areas, and supporting facilities,…
BHF Appliances, Camiling

BHF Prime Group Corporation (Camiling)

BHF Prime Group Corporation (Camiling) Multi-Store Appliance Retailer System Size: 9.90 kWp Completion: 29-Jun-2015 Camiling, Tarlac, Philippines Project Summary BHF Appliances in Camiling marked one of the company’s earliest commercial solar PV installations, reinforcing its position as an early adopter of renewable energy in Northern Luzon. As a long-established appliance…
BHF Appliances, Paniqui

BHF Prime Group Corporation (Paniqui)

BHF Prime Group Corporation (Paniqui) Retail Appliances and Warehouse Facility System Size: 9.90 kWp Completion: 6-Jun-2015 Paniqui, Tarlac, Philippines Project Summary Retail appliance stores run continuous daytime loads: lighting across large display areas, cooling systems, demonstration equipment, and point-of-sale infrastructure. For BHF Appliances in Paniqui, Tarlac, the consumption across multiple…
PLERM Construction

PLERM Construction

PLERM Construction Construction and civil engineering contractor, JICA partner System Size: 11.00 kWp Completion: 23-May-2015 Santa Maria, Bulacan, Philippines Project Summary Construction companies run heavy electrical loads in site offices, fabrication equipment, lighting across large facilities  and Plerm Construction’s monthly utility bills reflected that. As one of Bulacan’s longest established…
Mike King

King’s Residence

King’s Residence Advanced Hybrid System for Family Home System Size: 25.80 kWp Completion: 16-May-2015 Camiling, Tarlac, Philippines Project Summary This residence began as a fully German-engineered grid-tied installation many years ago. At the time, the objective was simple: reduce electricity costs through reliable daytime solar generation. The original system performed…
Pure and Pam

Pure and Pam

Pure and Pam Electrical Contractor Yard + Warehouse System Size: 16.50 kWp Completion: 13-May-2015 Mexico, Pampanga, Philippines Project Summary An electrical contractor running a warehouse, equipment yard, and administration offices knows exactly what good electrical installation looks like. Pure and Pam in Mexico, Pampanga works with electrical systems daily. When…
Albano

Albano

Albano Grid-Tied Solar with Full Daytime Offset System Size: 11.00 kWp Completion: 13-May-2015 San Fernando, Pampanga, Philippines Project Summary When an electrical engineering contractor builds a new home, every system specification is a professional decision. There is no sales process to navigate, just a technical evaluation of what works and…
BHF Appliances, F. Tañedo

BHF Prime Group Corporation (F.Tañedo)

BHF Prime Group Corporation (F.Tañedo) Appliance Showroom and Retail Center System Size: 11.00 kWp Completion: 29-Nov-2014 Tarlac City, Philippines Project Summary BHF Appliances on F. Tañedo Street in Tarlac City was one of the first commercial clients to trust Solaren with a solar installation. That was November 2014. The system…
BHF Bank

BHF Prime Group Corporation (BHF Bank)

BHF Prime Group Corporation (BHF Bank) Branch Banking Location Solarized System Size: 11.00 kWp Completion: 29-Nov-2014 Tarlac City, Tarlac, Philippines Project Summary A bank branch cannot afford power interruptions. Bank Operations, online infrastructure, air conditioning, and lighting run continuously across every banking hour, and the electricity bill reflects that. For…
Corrinthian

Corrinthian

Corrinthian German Solar Premium Grid Tied System Size: 5.50 kWp Completion: 1-Oct-2024 Corinthian Gardens, Quezon City, Philippines Project Summary This installation represents one of Solaren’s early fully German grid-tied systems, deployed on a premium residence within one of the National Capital Region’s most established subdivisions. At the time, residential solar…
Lenox

Lenox

Lenox Paper and Processing Factory System Size: 55.50 kWp Completion: 9-Nov-2014 Caloocan, NCR, Philippines Project Summary Lenox Paper, based in Caloocan City along Tanigue Street, is a long-standing supplier of paper products and office essentials serving schools, local businesses, and administrative offices. Their operations depend on consistent daytime electricity for…
BHF Applicances

BHF Prime Group Corporation (BHF Flagship)

BHF Prime Group Corporation (BHF Flagship) Appliance Retailer with Multi-Store Rollout System Size: 16.92 kWp Completion: 1-May-2014 Tarlac City, Tarlac, Philippines Project Summary BHF Appliances is a well-established retail brand with branches across the city and provincial centers throughout Northern Luzon. As an early solar PV adopter, the company recognized…
pearce

Pearce Residence

Pearce Residence Multi-System Hybrid + Grid Solar Residence and Office. Zero Billing System Size: 50.00 kWp Completion: 1-Mar-2014 La Paz, Tarlac, Philippines Project Summary This residence represents one of the most advanced and long-running residential energy systems in Solaren’s portfolio. Developed progressively over more than a decade, the installation combines…
BIR RR4

BIR RR4

BIR RR4 Government Revenue Region IV Facility System Size: 398.56 kWp Completion: 16-Feb-2014 San Fernando, Pampanga, Philippines Project Summary The BIR RR4 Regional Complex serves as the revenue headquarters for the region, operating across multiple government buildings with varying occupancy patterns. Weekday demand is consistently high due to office operations,…
BHF Appliances

BHF Prime Group Corporation (Guimba)

BHF Prime Group Corporation (Guimba) Appliance Retailer with Multi-Store Rollout System Size: 16.92 kWp Completion: 16-May-2013 Guimba, Nueva Ecija, Philippines Project Summary BHF Appliances in Guimba became the first major retailer in the province to integrate solar energy across its operations. At a time when commercial solar adoption was still…
Renewable Energy Solutions

GET A QUOTE