Call Us

0917 879 6037

Send Mail

sales@solaren-power.com

New Zealand Creamery tn

New Zealand Creamery

New Zealand Creamery Dairy Processing Plant System Size: 2.16 MWp Completion: 13-Dec-2019 Calamba, Laguna, Philippines Project Summary The New Zealand Creamery project is one of the most recognised commercial solar installations in the Philippines. Completed at a large dairy processing facility within Carmelray Industrial Park I in Calamba, Laguna, the…
OISHI Cebu

OISHI Cebu

OISHI Cebu Food Production, Manufacturing System Size: 719.80 kWp Completion: 22-Oct-2025 Liloan, Cebu, Philippines Project Summary Large-scale food manufacturing runs on uninterrupted power. At Oishi’s Cebu plant in Liloan, cooking lines, packaging equipment, and refrigeration systems operate continuously across long production shifts, drawing over 600kW at peak. For a facility…
Taytay, Freshwater Plant

Taytay, Freshwater Plant

Taytay, Freshwater Plant Rural freshwater supply and solar-powered water pumping & distribution facility System Size: 54.00 kWp Completion: 18-Jan-2018 Taytay, Palawan, Philippines Project Summary Access to clean drinking water is something most Filipinos in cities and town areas take for granted. For one remote barangay in the mountains of Palawan…
Atlantic Grains

Atlantic Grains

Atlantic Grains Grain Milling and Storage System Size: 1460.00 kWp Completion: 23-Sep-2023 Calaca, Batangas, Philippines Project Summary Atlantic Grains is the biggest grain-importing, processing, storage, and distribution plant in the Philippines, and it is the core element of the country’s food supply chain. It has an enormous scope of operation…
oishi

Oishi

Oishi Food Manufacturing – Imus / Pasay (Multi Site) System Size: 616.70 kWp Completion: 6-Sep-2021 Imus, Cavite, Philippines Project Summary Oishi is a brand that is known to households in the Philippines and other countries, and it manufactures snack foods consumed by millions of people. One of the company’s most…
toyota bacoor

Toyota Bacoor

toyota bacoor Main Dealership with Workshop System Size: 590.00 kWp Completion: 13-Jun-2021 Bacoor, Cavite, Philippines Project Summary Toyota Bacoor is a flagship automotive dealership serving the expanding Cavite market, combining a large showroom, service workshops, customer facilities, and a high-volume parts operation. These activities create sustained daytime electricity demand driven…
Philippine Bobbin Corporation

Philippine Bobbin Corporation

Philippine Bobbin Corporation (Imperial Tobacco PLC) Tobacco Manufacturing Plant System Size: 483.96 kWp Completion: 11-Apr-2024 Rosario, Cavite, Philippines Project Summary Philippine Bobbin Corporation is a large factory within a PEZA zone located in Cavite that manufactures parts that are used in the operations of its parent company, which is Imperial…
Renewable Energy Systems

Oishi Iloilo

Oishi Iloilo Snack Foods Production Hub System Size: 410.40 kWp Completion: 11-Sep-2023 Pavia, Iloilo, Philippines Project Summary Oishi’s Iloilo facility is essential to serve the Visayas region and manufacture and deliver the company’s favorite snack food to a broad market. The site, like all other large-scale food manufacturing facilities, will…
Bench Philippines I

Bench Philippines I

Bench Philippines I Warehouse, Multinational Brand System Size: 135.52 kWp Completion: 5-Mar-2025 Taguig, NCR, Philippines Project Summary Bench is one of the Philippines’ most recognised lifestyle brands, operating a network of warehouse, manufacturing, and logistics facilities across Taguig through its wider group of subsidiaries. With continuous daytime demand from production,…
Bench Philippines

Bench Philippines II

Bench Philippines II Warehouse + Product Fulfillment System Size: 135.52 kWp Completion: 3-May-2025 Taguig, NCR, Philippines Project Summary Bench is one of the Philippines’ most recognised lifestyle brands. Behind the retail presence is a large warehouse and product fulfillment complex in Taguig running heavy daytime loads across multiple buildings: lighting,…
Charlesland Farm

Charlesland Farm

Charlesland Farm Solar rooftop offsets hog facility demand System Size: 200.00 kWp Completion: 15-Jan-2026 Capas, Tarlac, Philippines Project Summary Charlesland Farm is a commercial piggery where electricity is a constant operating cost, driven by ventilation, feeding systems, water pumps, and lighting that run throughout the day. The rooftop solar system…
BIR RR4

BIR RR4

BIR RR4 Government Revenue Region IV Facility System Size: 398.56 kWp Completion: 16-Feb-2014 San Fernando, Pampanga, Philippines Project Summary The BIR RR4 Regional Complex serves as the revenue headquarters for the region, operating across multiple government buildings with varying occupancy patterns. Weekday demand is consistently high due to office operations,…
Osias Colleges

Osias Colleges

Osias Colleges University Campus PV Install System Size: 280.00 kWp Completion: 2-May-2023 Tarlac City, Tarlac, Philippines Project Summary The Osias College’s solar installation demonstrates how renewable energy can be deployed effectively across a complex educational campus. The project was delivered in multiple phases, spanning several buildings with different roof structures,…
J Poon Realty

J Poon Realty

J Poon Realty Storage and Processing Warehouse + Offices System Size: 200.56 kWp Completion: 18-May-2023 Calamba, Laguna, Philippines Project Summary J. Poon Realty is the company affiliated with Atlantic Grains, which promotes one of the largest networks of food supply in the Philippines, assisted by extensive storage, processing, and distribution…
Kabayan Hotel

Kabayan Hotel

Kabayan Hotel Urban Tourist Hotel Solar System Size: 198.00 kWp Completion: 22-Jul-2022 Pasay, NCR, Philippines Project Summary Kabayan Hotel is no exception, as it is one of the oldest hospitality brands offering affordable guest hotels in Metro Manila. The hotel is located in Pasay Central and has both local and…
Solaren Power Office

Solaren Power Office

Solaren Power Office Solaren Solar Carport with EV Charging and Office Power Support System Size: 35.97 kWp Completion: 6-Apr-2024 La Paz, Tarlac, Philippines Project Summary Solaren designed and installed a solar carport system at its office to deliver shaded parking, on-site electric vehicle charging, and direct daytime power support for…
Kings Court

Kings Court

Kings Court Office Building Cluster with Shared Rooftop PV System Size: 181.17 kWp Completion: 10-Jun-2022 Makati, NCR, Philippines Project Summary King’s Court is a premium office development located in the heart of Makati’s financial district. The building operates in one of the most energy-intensive environments in the country, with continuous…
Holy Angel University

Holy Angel University

Holy Angel University University Campus Array System Size: 178.68 kWp Completion: 6-Apr-2024 Angeles City, Pampanga, Philippines Project Summary The largest private university in Central Luzon is Holy Angel University, which boasts a population of over 21000 students on a single campus in central Angeles City. That scale indicates its years…
angeles iceplanttn

Angeles Ice Plant

Angeles Ice Plant Industrial Ice Production Facility System Size: 146.40 kWp Completion: 18 June 2019 Angeles City, Pampanga, Philippines Project Summary The Angeles Ice Plant project shows how solar energy could be used to power one of the most energy-consuming businesses in the Philippines. Ice production is 24 hours a…
Jorisan Farm

Jorisan Farm

Jorisan Farm Mid-scale Poultry Facility System Size: 140.00 kWp Completion: 3-Mar-2022 Caba, La Union, Philippines Project Summary Project Summary Jorisan Poultry Farm operates as part of a growing agricultural network focused on stable, large-scale chicken production. Power demand on-site is substantial, driven by tunnel ventilation fans, evaporative cooling pads, lighting,…
YSV Feed Mill Phase 1

YSV Feed Mill Phase 1

YSV Feed Mill Phase 1 Commercial / Agricultural Solar Installation – Feed mill System Size: 99.90 kWp Completion: 1-Nov-2025 Sta Ignacia, Tarlac, Philippines Project Summary Feed mill operations are among the most electrically demanding in agribusiness. Heavy machinery, continuous processing lines, packaging equipment, and storage systems run across long operational…
Hatchery

Hatchery

Hatchery Poultry Hatchery & Breeding Solar Facility System Size: 100.21 kWp Completion: 16-Jul-2024 Sta Ignacia, Tarlac, Philippines Project Summary The initial stage of an entire farm network is the hatchery. Chicks at an early stage require a tight tightness of temperatures and airflow and any power problem is manifested quickly.…
Kart City

Kart City

Kart City Leisure + Kart Track and Bowling Alley System Size: 100.00 kWp Completion: 8-Sep-2025 Tarlac City, Tarlac, Philippines Project Summary Kart City has become one of the main entertainment places in the town of Tarlac and has something to offer to everyone. The facility started with a popular go-kart…
North Victoria Sports and Liesure Inn

North Victoria Sports and Leisure Inn

North Victoria Sports and Leisure Inn Hotel, Sports + Leisure Complex System Size: 100.00 kWp Completion: 11-Sep-2025 Victoria, Tarlac, Philippines Project Summary North Victoria Sports and Leisure Inn is the newest and one of the ambitious leisure interests in the province, which offers accommodation and lodging with a diverse variety…
Northeastern Colleges

Northeastern Colleges

Northeastern Colleges Multi-Building School Solar Deployment System Size: 99.99 kWp Completion: 13-Sep-2022 Santiago City, Isabella, Philippines Project Summary Northeastern Colleges is a long-established educational institution in Santiago City, recognized for its academic standards and well-developed campus facilities. As the campus expanded, electricity demand grew beyond classrooms and administrative buildings to…
LACA

LACA

LACA Christian Leaning and Education System Size: 99.99 kWp Completion: 21-Oct-2024 Baliwag, Bulacan, Philippines Project Summary Jorisan Hotel is a beachfront resort in Bauang, La Union, welcoming guests to one of the most exposed coastal environments in Northern Luzon. Like most seaside hotels, energy demand is constant. Guest room cooling,…
J Mart Department Store

J Mart Department Store

Sun Garden Hotel Hotel – Events + Guest Rooms Hybrid System Size: 99.98 kWp Completion: 2-Feb-2024 Tarlac City, Tarlac, Philippines Project Summary The Sun Garden Hotel has managed to establish itself as one of the most prestigious places of the Tarlac city where its visitors are provided with a highly…
Victoria Industrial Park

Victoria Industrial Park

Victoria Industrial Park PEZA-registered Industrial Hub System Size: 99.98 kWp Completion: 19-Aug-2018 Victoria, Tarlac, Philippines Project Summary Victoria Industrial Park is not only warehouses and factories, but also a hub of activity where sales, marketing, and administration take place to support a rapidly increasing industrial community. Being one of the…
Sun Garden Hotel

Sun Garden Hotel

Sun Garden Hotel Hotel – Events + Guest Rooms Hybrid System Size: 99.98 kWp Completion: 2-Feb-2024 Tarlac City, Tarlac, Philippines Project Summary The Sun Garden Hotel is a well-established hospitality destination in Tarlac City, known for modern guest rooms, attentive service, and a strong emphasis on comfort and sustainability. In…
Toyota Dasma

Toyota Dasma

Toyota Main Dealership with Workshop System Size: 99.83 kWp Completion: 24-Jul-2025 Dasmarinas, Cavite, Philippines Project Summary One of the busiest dealerships in the province is Toyota Dasmariñas, which features a modern showroom, a high-volume service center, a parts department, and customer care facilities. The energy profile of the site is…
Eumann Dressing Plant

Eumann Dressing Plant

Eumann Dressing Plant Cold Storage & Food Processing Facility System Size: 99.76 kWp Completion: 19-Dec-2024 Rosales, Pangasinan, Philippines Project Summary The Eumann Dressing Plant located in Rosales, Pangasinan, is a multi-purpose site where chickens are dressed to enter the market, and cold storage facilities are also offered to assist the…
Tañedo Poultry Farm

Tañedo Poultry Farm

Tañedo Poultry Farm Mid-Sized Poultry Operations Solar Array System Size: 99.75 kWp Completion: 4-Jul-2024 San Jose, Tarlac, Philippines Project Summary The arrangement of Tañedo is simple. Fans, cooling pads, and lighting in the daytime drive the bill. The farm did not need storage. It required a grid-tied system, which will…
Hi-Peak Poultry Farm

Hi-Peak Poultry Farm

Hi-Peak Poultry Farm Grid-Tied Poultry Ventilation & Cooling Solar System Size: 99.74 kWp Completion: 14-Sep-2024 Sta Ignacia, Tarlac, Philippines Project Summary Hi Peak is on a rural feeder on which the voltage may vary. It was important since fans, cooling systems, and controllers cannot work well with fluctuating power. The…
Tarlac Provincial Hospital

Tarlac Provincial Hospital

Tarlac Provincial Hospital Provincial Government Hospital System System Size: 99.68 kWp Completion: 28-Mar-2018 Tarlac City, Tarlac, Philippines Project Summary Tarlac Provincial Hospital is one of the most frequently visited medical institutions in the province, serving over a thousand patients annually. In its pursuit of energy efficiency, the hospital became one…
Romarosa

Romarosa

Romarosa Poultry Farm with Tunnel Ventilation System Size: 99.62 kWp Completion: 1-Jun-2023 Tanay, Rizal, Philippines Project Summary Romarosa operates large-scale poultry houses where flock health depends on continuous airflow, controlled lighting, and stable environmental conditions. Ventilation fans, cooling pads, and automated controllers draw significant power during the hottest parts of…
King's Natural Farm

Kings Orchard

Kings Orchard Organic Farm with Cold Storage System Size: 99.60 kWp Completion: 23-Aug-2024 San Miguel, Bulacan, Philippines Project Summary Cold storage is unforgiving. For Kings Orchard in San Miguel, Bulacan, a high-producing organic fruit and vegetable farm supplying fresh produce to market, power reliability is not an operational preference. It…
Living Angels Christian Academy

Living Angels Christian Academy

Living Angels Christian Academy Christian Community Senior High School System Size: 99.90 kWp Completion: 1-Oct-2024 Baliwag, Bulacan, Philippines Project Summary Running a senior high school serving underprivileged students means every peso of operational budget matters. For Living Angels Christian Academy in Baliwag, Bulacan, electricity costs were a direct drain on…
Moncada LGU

Moncada LGU

Moncada LGU Municipal Hall Rooftop System System Size: 91.56 kWp Completion: 9-Sep-2023 Moncada, Tarlac, Philippines Project Summary The Municipality of Moncada chose to invest in solar not as a gesture, but as infrastructure. For a local government unit, electricity is not optional. Administrative offices, public service departments, and daily operations…
Goodfield Trading

Goodfield Trading

Goodfield Trading Cosmetics Manufacturing System Size: 89.62 kWp Completion: 15-Dec-2023 Victoria, Tarlac, Philippines Project Summary For Goodfield Trading, electricity is a critical production input rather than a simple overhead. The company manufactures pharmaceutical and healthcare products for international markets, relying on stable temperature control, precision drying processes, and strict quality…
Yellowstone

Yellowstone

Yellowstone Poultry Layer Farm with High Day Load System Size: 75.90 kWp Completion: 20-Jun-2024 Sta Ignacia, Tarlac, Philippines Project Summary This farm location operates large poultry houses with 24/7 ventilation and cooling requirements. One of the most expensive costs that were persistently incurred is electricity, particularly during the months of…
Charlisons Farm

Charlisons Farm

Charlisons Farm Commercial hog farm, 24/7 energy demand System Size: 99.80 kWp Completion: 15-Feb-2026 Capas, Tarlac, Philippines Project Summary Charlisons Farm operates a high-capacity hog production facility where ventilation systems, automated feeding lines, temperature control, water circulation, and waste managementThe infrastructure functions continuously. The 100kWp solar installation was engineered against…
Kabalikat Poultry Farm

Kabalikat Poultry Farm

Kabalikat Poultry Farm Community Poultry Supply Solar Facility System Size: 75.90 kWp Completion: 15-Jun-2024 Sta Ignacia, Tarlac, Philippines Project Summary Kabalikat is closely connected with the local food chain as it provides chicken to the local markets and small retailers. The conditions in the stable barns are not negotiable. The…
KKK

KKK Gasoline, San Nicolas

KKK Gasoline, San Nicolas Gasoline Station Network System Size: 72.75 kWp Completion: 6-Nov-2022 Tarlac City, Tarlac, Philippines Project Summary San Nicolas is one of the busiest commercial forecourts in the KKK network. Beyond fuel operations, the site carries a wide mix of tenants: convenience retail, food outlets, and commercial spaces…
McDonalds

McDonalds

McDonalds Quick Service Restaurant Solar Retrofit System Size: 68.00 kWp Completion: 1-Sep-2022 Paniqui, Tarlac, Philippines Project Summary McDonald’s is one of the most renowned brands worldwide, serving thousands of customers in the Philippines. The operation of a quick-service restaurant implies working with high-value electrical bills, food cooking appliances, and refrigerators,…
Rivera Agro Industrial

Rivera Agro Industrial

Rivera Agro Industrial Hog Farm w/ Grower and Finisher Houses System Size: 75.21 kWp Completion: 22-Aug-2024 Bamban, Tarlac, Philippines Project Summary Rivera Agro Industrial operates a large-scale piggery where electricity is essential for pumps, ventilation, and waste management systems that run continuously. These loads are both power-hungry and critical to…
Rivera Agro Industrial phase 2

Rivera Agro Industrial phase 2

Rivera Agro Industrial phase 2 Large-scale hog-growing and livestock operation System Size: 100.00 kWp Completion: 21-Jul-2020 San Vincente, Bamban, Philippines Project Summary Large-scale hog farming runs on power. Climate-controlled barns, automated feeding systems, and ventilation infrastructure operate around the clock, and the electricity bill reflects it. For Rivera Agro Industrial…
Megasavers Cabanatuan

1st Mega Savers Cabanatuan

1st Mega Savers Cabanatuan Cabanatuan Appliance Store Rooftop System System Size: 63.36 kWp Completion: 5-Sep-2021 Cabanatuan, Nueva Ecija, Philippines Project Summary 1st Mega Savers Cabanatuan is one of the brand’s busiest retail branches, operating a large showroom with extensive lighting, illuminated displays, and continuous air-conditioning throughout trading hours. The store…
LMC Offices

LMC Offices

LMC Offices Corporate Office Complex System Size: 60.00 kWp Completion: 20-May-2024 Pasay, NCR, Philippines Project Summary The Oishi (Liwayway Marketing) brand boasts a wide product range, but behind it lies a corporate force that oversees R&D, marketing, logistics, and administration. The company’s offices, based in Pasay City, serve as a…
Forbes Park

WK Residence

WK Residence Premium Grid-Tied Residential Solar System Size: 58.41 kWp Completion: 28-Feb-2022 Forbes Park, Makati City,NCR, Philippines Project Summary This installation is located within a highly regulated, premium residential subdivision in central Metro Manila, where compliance, aesthetics, and technical approval requirements are strictly enforced. The property features a complex roof layout…
Lenox

Lenox

Lenox Paper and Processing Factory System Size: 55.50 kWp Completion: 9-Nov-2014 Caloocan, NCR, Philippines Project Summary Lenox Paper, based in Caloocan City along Tanigue Street, is a long-standing supplier of paper products and office essentials serving schools, local businesses, and administrative offices. Their operations depend on consistent daytime electricity for…
Don Jose Poultry Farm

Don Jose Poultry Farm

Don Jose Poultry Farm Layer & Broiler Poultry Complex Solar System System Size: 75.24 kWp Completion: 26-Jun-2024 Sta Ignacia, Tarlac, Philippines Project Summary The buildings owned by Don Jose include layer and broiler houses, and this fact demands various patterns of electricity on the same premises. Layers require long, continuous…
KKK Office

KKK Office

KKK Office Admin Office Tied to Gasoline Network System Size: 54.45 kWp Completion: 12-Jun-2022 Tarlac City, Tarlac, Philippines Project Summary The KKK Office operates as the administrative headquarters for a growing network of gasoline stations and retail outlets. From accounting and scheduling to logistics and inter-branch coordination, the office carries…
Tarlac Mac Chicken Farm

Tarlac Mac Chicken Farm

Tarlac Mac Chicken Farm Commercial poultry and egg production facility System Size: 99.98 kWp Completion: 20-Apr-2022 De La Paz, Tarlac City, Philippines Project Summary Poultry farming runs on continuous power. Ventilation, cooling, and automated feeding systems operate around the clock, and electricity costs eat directly into margin on every bird…
S&J Hardware Plus

S&J Hardware Plus

S&J Hardware Plus A large, high-traffic hardware supply and warehouse facility in Naga City that supports retail sales, storage, and continuous daily operations. System Size: 99.98 kWp Completion: 6-Dec-2025 Naga City, Philippines Project Summary S&J Hardware Plus in Naga City runs a busy retail and warehouse operation with steady daytime…
Royal Crown

Royal Crown

Royal Crown Contractor with Heavy Equipment & Field Sites System Size: 52.32 kWp Completion: 3-Sep-2022 Tarlac City, Tarlac, Philippines Project Summary Royal Crown is a construction and engineering contractor operating from a busy office and yard, coordinating active projects, logistics, and regional site operations. Daily electricity demand is driven by…
Grupo Marilen

Grupo Marilen

Grupo Marilen Distribution Warehouse with Night Load System Size: 52.08 kWp Completion: 25-Sep-2018 Santiago City, Isabella, Philippines Project Summary Grupo Marilen Inc. supplies essential food products. It provides frozen products, dairy, meat, seafood, fresh produce, and grocery products through its active logistics center in Santiago City, Isabela. The company has…
Sun City

Sun City

Sun City Hotel & Leisure Property – Solar Rooftop System Size: 51.10 kWp Completion: 6-Aug-2017 Tarlac City, Tarlac, Philippines Project Summary Sun City is a recreational hospitality destination where consistent power supply is essential to guest comfort, service quality, and daily operations. The property operates guest rooms, dining areas, swimming…
Laoang Poultry Farm

Laoang Poultry Farm

Laoang Poultry Farm Large-Scale Poultry House Renewable Energy System System Size: 54.72 kWp Completion: 29-Jun-2024 Sta Ignacia, Tarlac, Philippines Project Summary Laoang has big houses in which air movement increases with the growth of birds. That curve was reflected on the electric bill. Solar transformed the everyday expenses. To reduce…
Megasavers

1st Mega Savers Magalang

1st Mega Savers Magalang Appliance Store Rooftop System System Size: 50.14 kWp Completion: 12-Aug-2023 Magalang, Pampanga, Philippines Project Summary 1st Mega Savers is a major appliance retailer in Central Luzon, serving both households and businesses through large-format stores with extended operating hours. Full lighting and continuous air-conditioning create high and…
pearce

Pearce Residence

Pearce Residence Multi-System Hybrid + Grid Solar Residence and Office. Zero Billing System Size: 50.00 kWp Completion: 1-Mar-2014 La Paz, Tarlac, Philippines Project Summary This residence represents one of the most advanced and long-running residential energy systems in Solaren’s portfolio. Developed progressively over more than a decade, the installation combines…
Wellissa Farm

Wellissa Farm

Wellissa Farm Hog + Poultry Farm – Integrated Solar System System Size: 47.25 kWp Completion: 8-Oct-2017 Bantayan, Cebu, Philippines Project Summary Wellissa Farm is a diversified agricultural operation combining poultry houses, layer facilities, and hog production on a single site. This mix creates a complex energy profile, with continuous ventilation…
Creston Academy

Creston Academy

Creston Academy Private School Rooftop Installation System Size: 45.78 kWp Completion: 9-Oct-2022 Tarlac City, Tarlac, Philippines Project Summary Creston Academy is one of the region’s most respected private schools, known for high academic standards and disciplined institutional leadership. With classrooms, laboratories, offices, and shared learning spaces operating throughout the day,…
CK Hog Farm

CK Hog Farm

CK Hog Farm Hog Grow-out Farm with Off-Grid Option System Size: 50.22 kWp Completion: 17-Aug-2018 Tanay, Rizal, Philippines Project Summary The CK Hog Farm project demonstrates that solar energy has the potential to supplement farming activities that require high and constant energy. Since it is an existing large hog breeding…
Calayaan Poultry Farm

Calayaan Poultry Farm

Calayaan Poultry Farm Commercial Broiler House Solar Installation System Size: 43.32 kWp Completion: 21-Jun-2024 Sta Ignacia, Tarlac, Philippines Project Summary The houses in Calayaan are working very hard in the hot months, and fans and evaporation cooling pads are maintained to safeguard the health of the flocks. Before solar, summer…
Golden Crown Thumbnail

Golden Crown

Golden Crown Confectionery Manufacturing Plant System Size: 41.58 kWp Completion: 19-Oct-2021 Tarlac City, Tarlac, Philippines Project Summary Golden Crown has built its international reputation on precision confectionery and high-quality cake decorations supplied to global markets. In food manufacturing, consistency is critical. Even brief power interruptions can disrupt temperature-sensitive production batches,…
Premium Home

Prime Residence

Prime Residence VIP Residence Premium Grid-Tied Solar Installation with zero billing System Size: 36.88 kWp Completion: 26-Jun-2023 Tarlac City, Philippines Project Summary This high-profile private residence was designed from the outset with energy integration in mind, combining architectural detail with demanding electrical loads. The property features complex slate roofing, guest…
Pugad Adventure

Pugad Adventure

Pugad Adventure Adventure & Outdoor Recreation Park System Size: 36.36 kWp Completion: 30-Aug-2015 Pugo, La Union, Philippines Project Summary Pugad Adventure is an outdoor recreation destination where families, groups, and tourists spend extended time enjoying nature-based activities. The park operates zip lines, swimming pools, restaurants, guest areas, and supporting facilities,…
KKK Gasoline, Matatalaib II

KKK Gasoline, Matatalaib II

KKK Gasoline, Matatalaib II Fuel and Commercial Property Development System Size: 36.60 kWp Completion: 4-Oct-2025 Tarlac City, Philippines Project Summary The Matatalaib II site represents a more complex energy brief than a standard fuel station. Alongside forecourt operations, the property includes multiple connected commercial units, each adding to a combined…
KKK Conrey Tarlac

KKK Conrey Tarlac

KKK Conrey Tarlac Commercial Space, Rental, Gas Station System Size: 36.60 kWp Completion: 8-Aug-2025 Tarlac City, Philippines Project Summary KKK Conrey in Tarlac City is not a simple fuel station. It is a commercial hub: multiple tenants, retail spaces, and a high-traffic forecourt generating revenue streams that depend entirely on…
Zen Hotel

Zen Hotel

Zen Hotel Hotel with Function Room Support System Size: 35.64 kWp Completion: 3-Jul-2016 Santiago City, Isabella, Philippines Project Summary Hotels don’t switch off. Guest rooms, restaurant operations, function spaces, and back-of-house systems run continuously, and the air conditioning load alone is substantial across a Santiago City summer. For Zen Hotel,…
Katinko Tarlac

Katinko Tarlac

Katinko Tarlac Herbal liniment plant with packaging demand System Size: 47.12 kWp Completion: 13-Feb-2026 Victoria, Tarlac, Philippines Project Summary Katinko Tarlac produces herbal liniments and wellness products under a nationally recognizedbrand closely associated with natural ingredients and sustainability positioning. The grid-tiedsolar installation offsets daytime mixing, blending, heating, filling, and packaging…
J Co

J.Co Donuts

J.Co donuts Retail Donut Store + Chiller Loads System Size: 32.70 kWp Completion: 30-Apr-2024 Imus, Cavite, Philippines Project Summary J.CO Donuts is a well-known household brand in the retail food industry, and its specialty donuts, coffee, and baked goods; the store has an active flow of customers. The company’s flagship…
Figeroa

Figueroa’s Residence

Figueroa’s Residence Hybrid Residential System with Day-Night Automation System Size: 31.05 kWp Completion: 30-Oct-2024 Concepcion, Tarlac, Philippines Project Summary The Figueroa residence in Concepcion, Tarlac is not a standard rooftop solar installation. Bifacial panels mounted over the swimming pool create a striking architectural feature while simultaneously solving the home’s energy brief:…
BIR Tarlac

BIR Tarlac

BIR Tarlac Government Office Installation System Size: 30.78 kWp Completion: 9-Jan-2019 Tarlac City, Tarlac, Philippines Project Summary The Bureau of Internal Revenue office in Tarlac serves the public daily, relying on stable electricity to support lighting, cooling systems, computer networks, and client-facing services. Peak demand occurs during daylight hours, when…
Chua Residence

Chua Residence

Chua Residence Urban Grid-Tied Solar Installation with 90% bill reduction System Size: 29.26 kWp Completion: 5-Jan-2022 Quezon City, Philippines Project Summary The Chua Residence, located in a quiet subdivision in Quezon City, is a premium residential installation designed around substantial daily energy demand. The property supports both household living and…
Villa Perpetua

Villa Perpetua

Villa Perpetua Luxury subdivision residence powered by a premium grid-tied system for full offset and zero-bill performance. System Size: 13.80 kWp Completion: 18-Jun-2024 Villa Perpetua, Tarlac, Philippines Project Summary This 13.80 kWp residential installation was executed on a single, uninterrupted roof plane, allowing for a clean, symmetrical layout and optimal…
Pro build Residence

Pro Build Residence

Pro build Residence Magnificent House and complex covering a large area. Zero bill targeting System Size: 26.68 kWp Completion: 16-Apr-2025 Tarlac City, Philippines Project Summary This contemporary three-phase residential installation was engineered for a growing family with rising electrical demand. From the outset, the brief was to support high-consumption features…
Espiritu Residence

Espiritu Residence

Espiritu Residence Premium system in the beautiful Hacienda Luisita Golf Club System Size: 10.00 kWp Completion: 2-Dec-2025 Hacienda Luisita, Tarlac, Philippines Project Summary A beautifully executed residential solar installation inside the exclusive Luisita Golf and Country Club. The system delivers strong daily generation and blends naturally with the home’s architecture,…
Kayrilaw

Kayrilaw

Kayrilaw Organic Farm – Off-Grid Solar and Storage Pilot System Size: 28.90 kWp Completion: 1-Jul-2022 Nasugbu, Batangas, Philippines Project Summary Kayrilaw is an organic agricultural farm located in the remote highlands between Nasugbu and Cavite, where grid power is intermittent, unstable, and frequently unavailable. Reliable electricity is essential for daily…
3K Hotel

3K Hotel

3K Hotel City Hotel Rooftop System System Size: 28.56 kWp Completion: 16-Jun-2018 Santiago City, Isabella, Philippines Project Summary The 3K Hotel project demonstrates how solar can deliver strong financial returns even when roof space is constrained. As a multi-purpose hotel and function venue, the property operates with consistent occupancy across…
Megasavers Office

1st Mega Savers Office

1st Mega Savers Office Administration and Back Office Solar System Size: 28.00 kWp Completion: 14-Nov-2021 Tarlac City, Tarlac, Philippines Project Summary The 1st Mega Savers main office in Tarlac City is the operational backbone of a multi-branch retail network. Purchasing, warehousing, marketing, and branch coordination all run from this facility,…
Buena Chix Farm

Buena Chix Farm

Buena Chix Farm Integrated poultry farm with high energy demand System Size: 99.90 kWp Completion: 13-Mar-2026 Banaba, Tarlac City, Philippines Project Summary Buena Chix Farm operates a 100kWp solar installation supporting a fully integrated poultry and hatchery facility where incubation chambers, broiler housing, layer systems, automated feeding lines, and mechanical…
Eriguel Residence

Eriguel Residence

Eriguel Residence Grid-Tied Solar for Provincial Family Home System Size: 27.02 kWp Completion: 5-Jul-2021 Loyola Grand Village, Marikina City, Philippines Project Summary Project Summary This installation in Loyola Grand Village, Marikina City was engineered as a smartly sized grid-tied solar solution tailored precisely to the homeowner’s daytime load profile. Rather than…
Tarlac Contractors

Probuild Tarlac

Probuild Tarlac Construction Company Offices and Storage System Size: 26.16 kWp Completion: 14-Dec-2022 Conception, Tarlac, Philippines Project Summary Construction company overheads are relentless. Office staff, engineers, logistics coordinators, and project managers running air conditioning, computer systems, and communications equipment across a busy Tarlac facility means the electricity meter never stops.…
KKK Royal Lily

KKK Royal Lily

KKK Royal Lily Flagship Mixed-use Commercial Development. System Size: 184.83 kWp Completion: 28-Feb-2026 Tarlac City, Philippines Project Summary Lily is the flagship mixed-use site in the network, combining fuel distribution, foodservice, and retail under one operational footprint. Electrical demand spans refrigeration,ventilation, lighting, digital infrastructure, and forecourt equipment, creating a reliable…
Hamilton's Restaurant

Hamilton’s Restaurant

Hamilton’s Restaurant Solar-Powered Restaurant with Outdoor Dining System Size: 26.16 kWp Completion: 17-Aug-2022 La Paz, Tarlac, Philippines Project Summary Hamilton Restaurant is one of Tarlac’s most recognized event venues, known for premium dining, weddings, and large community gatherings. Operating a busy restaurant and function space requires substantial electricity, from commercial…
Angeles Electric

Angeles Electric

Angeles Electric Regional Power Distribution Utility And Energy Service Provider System Size: 16.80 kWp Completion: 14-Feb-2018 Angeles City, Pampanga, Philippines Project Summary Angeles Electric Corporation, one of the leading utilities in Central Luzon, selected Solaren to install a high-quality grid-tied solar power system at its substation in Angeles City. The…
Rivera

Rivera Residence

Rivera Residence Residential Solar for Day Use and Export Offset System Size: 26.16 kWp Completion: 14-Dec-2022 Concepcion, Tarlac, Philippines Project Summary This modern bungalow was designed from the outset to take full advantage of solar generation during the day and grid interaction. The residence features a clean, integrated grid-tied solar…
KKK Sta Ignacia II

KKK Sta Ignacia II

KKK Sta Ignacia II Gasoline Station With Commercial Tenants System Size: 24.40 kWp Completion: 16-Sep-2025 Sta Ignacia, Tarlac, Philippines Project Summary This site is a gasoline station with several commercial tenants operating on the same property. The forecourt runs pumps, lighting, and safety systems throughout the day, while the attached…
RMCT

RMCT

RMCT Mixed-Use Commercial Building System Size: 19.62 kWp Completion: 23-Sep-2022 Tarlac City, Philippines Project Summary This property is a mixed-use commercial building located in a busy town center. The ground floor is occupied by small retail businesses, while the upper levels serve as storage, offices, and workspace for daily operations.…
BV Cuisine

BV Cuisine

Carbonel Farm Large-scale poultry farm with baseload demand System Size: 100.00 kWp Completion: 14-Mar-2026 Gerona, Tarlac, Philippines Project Summary Carbonel Farm operates a 100kWp solar installation supporting breeder and poultry production facilities with stable and predictable daytime electrical demand. Ventilation systems, feed handling equipment, lighting arrays, and operational processing infrastructure…
Lee Residence

Lee Residence

Lee Residence Large-Scale Residential Solar Complex System Size: 19.62 kWp Completion: 15-May-2023 San Sebastian, Tarlac City, Philippines Project Summary The Lee Residence features a 19.62 kWp fully net-metered solar installation designed to serve both household consumption and electric vehicle charging. The architectural centrepiece is a custom-built solar canopy, engineered not…
Carbonel Farm

Carbonel Farm

Carbonel Farm Large-scale poultry farm with baseload demand System Size: 100.00 kWp Completion: 14-Mar-2026 Gerona, Tarlac, Philippines Project Summary Carbonel Farm operates a 100kWp solar installation supporting breeder and poultry production facilities with stable and predictable daytime electrical demand. Ventilation systems, feed handling equipment, lighting arrays, and operational processing infrastructure…
Mike King

King’s Residence

King’s Residence Advanced Hybrid System for Family Home System Size: 25.80 kWp Completion: 16-May-2015 Camiling, Tarlac, Philippines Project Summary This residence began as a fully German-engineered grid-tied installation many years ago. At the time, the objective was simple: reduce electricity costs through reliable daytime solar generation. The original system performed…
Cojuangco

Cojuangco Residence

Cojuangco Residence Heritage Home Grid-Tied Solar Upgrade System Size: 25.70 kWp Completion: 20-Oct-2022 Paniqui, Tarlac, Philippines Project Summary This premium residential installation was designed with a clear objective: reduce grid dependence and stabilize long-term household energy costs in a highly volatile utility environment. The property sits in an area where…
Yellowstone Office

Yellowstone Office

Yellowstone Office Farm Management & Administration Center Solar System System Size: 25.20 kWp Completion: 22-Jun-2024 Tariji, Tarlac, Philippines Project Summary This facility serves as the central management and coordination office for a multi-site farm group, overseeing sales, planning, procurement, and dispatch across several agricultural operations. While electrical loads are lighter…
Jaime Lim

Lim’s Residence

Lim’s Residence Urban Grid-Tied Solar Home System Size: 25.00 kWp Completion: 24-Mar-2022 Ayala Heights, Quezon City, Philippines Project Summary The Lim Residence in Ayala Heights sits on one of Metro Manila’s most premium ridgelines, with architecture designed to showcase the view and keep lines clean. Solaren delivered a flagship residential…
Uycana Residence

Uycana Residence

Uycana Residence Premium subdivision home achieving full energy independence through a high-efficiency solar system. System Size: 34.8 kWp Completion: 12-Apr-2025 Northern Hills, Tarlac City, Philippines Project Summary This 34.8 kWp premium residential system was a long-awaited project for the homeowner. The main house, finished with clay roof tiles, presented structural…
Five Star Bus Terminal

Five Star Bus Terminal

Five Star Bus Terminal Public transport terminal with food and passenger facilities System Size: 54.00 kWp Completion: 6-Jun-2023 La Paz, Tarlac, Philippines Project Summary Five Star Bus Terminal is one of the busiest intercity transport hubs in Central Luzon, operating around the clock and serving a continuous flow of passengers,…
Servitek

Servitek

Servitek Car Maintenance Shop with Daylighting + PV System Size: 24.75 kWp Completion: 9-Jun-2022 Tarlac City, Tarlac, Philippines Project Summary Servitek operates a busy automotive service workshop known for consistent vehicle care and high customer throughput. Daily operations rely on uninterrupted power for diagnostic equipment, tools, lighting, ventilation, and customer-facing…
KKK Gasoline, Matatalaib I

KKK Gasoline, Matatalaib I

KKK Gasoline, Matatalaib I Integrated Fuel and Retail Center System Size: 24.40 kWp Completion: 26-Sep-2025 Tarlac City, Philippines Project Summary The Matatalaib I site serves a dual purpose: fuel station and integrated retail center, with daytime loads running across both operations simultaneously. For a site carrying that combined consumption, grid…
Roxas Paniqui

Roxas Residence

Roxas Residence Provincial Grid-Tied Solar Home System Size: 24.50 kWp Completion: 6-Oct-2025 Paniqui, Tarlac, Philippines Project Summary When a new home is designed from the ground up, every system decision is an opportunity to do things properly rather than retrofit them later. For this premium residence in Paniqui, Tarlac, solar…
San Lorenzo Village

San Lorenzo Village

San Lorenzo Village AI-Enabled Smart Hybrid Home plus EV Charging Hub System Size: 24.00 kWp Completion: 11-Aug-2025 San Lorenzo, Makati, Philippines Project Summary State-of-the-art hybrid setup with smart AI controls, battery integration, and integrated multiple EV charging. System Performance System Size: 24.00 kWp Annual Generation: 35,400 kWh Day Peak Load:…
Janus Lim

Janus Lim

Janus Lim Premium hybrid solar with 30 kWh battery System Size: 16.38 kWp Completion: 14-Mar-2026 Tarlac City, Philippines Project Summary Tarlac City’s grid supply is reliable enough for most daily needs, but for this family, reliable was not the goal. The objective was complete energy independence, a home that generates,…
Lotus tn

Lotus

Lotus Soap Manufacturing Facility System Size: 23.76 kWp Completion: 2-Apr-2017 Las Pinas, NCR, Philippines Project Summary In April 2017, Lotus Manufacturing in Las Piñas made a decision that no Philippine solar client had made before: they specified bifacial solar panels. At the time, bifacial technology was emerging but unproven in…
Murrell Residence

Murrell Residence

Murrell Residence Suburban Grid-Tied Solar Residential System System Size: 22.56 kWp Completion: 14-Dec-2018 San Fernando, Pampanga, Philippines Project Summary This residential installation was engineered as a fully grid-tied system designed to match daytime household demand while exporting surplus generation to SFELAPCO under net metering. From the beginning, the objective was…
Yeung Residence

Yeung Residence

Yeung Residence Flat-roof solar in gated subdivision System Size: 23.98 kWp Completion: 10-Sep-2025 Silang Cavite, Philippines Project Summary The Yeung Residence in Cavite presented a set of installation challenges that demanded careful planning before a single panel was placed. The property sits within a subdivision with strict height restrictions, and…
New World Trading

New World Trading

New World Trading Supermarket & Grocery Solar Site System Size: 20.79 kWp Completion: 30-May-2022 Tarlac City, Tarlac, Philippines Project Summary New World Trading is a high-traffic supermarket serving a steady daily customer base. Much like most retail food environments, its electricity demand is concentrated during business hours and driven by…
KKK Sison

KKK Sison

KKK Sison Gasoline station and retail service complex System Size: 10.01 kWp Completion: 8-Oct-2024 Sison, Pangasinan, Philippines Project Summary Gasoline station margins are thin. When you are competing on fuel price across a network of sites, every peso of operating cost matters. For KKK Gasoline in Sison, Pangasinan, electricity running…
Nolet Beach Resort

Nolet Beach Resort

Nolet Beach Resort Solar for Pool + Villas System Size: 20.70 kWp Completion: 10-Apr-2025 Sta Lucia, Ilocos Sur, Philippines Project Summary Beachfront resorts in Ilocos Sur face an engineering challenge that inland installations don’t. Salt mist, coastal winds, and seasonal typhoons demand a specification that goes beyond standard rooftop solar,…
Gopez

Gopez Residence

Gopez Residence Hybrid Solar with Battery Backup for Family Residence System Size: 20.70 kWp Completion: 1-Oct-2024 Magalang, Pampanga, Philippines Project Summary A large family home in Magalang, Pampanga, runs substantial loads around the clock. For the Gopez family, partial grid offset was not the goal. Complete energy independence was.  …
El Cabalen

El Cabalen

El Cabalen Hotel and hospitality establishment System Size: 46.89 kWp Completion: 2-May-2022 San Sebastien, Tarlac City, Philippines Project Summary El Cabalen is a high-occupancy hotel in the center of Tarlac City, serving a steady flow of guests throughout the year. With guest rooms, kitchens, lighting, and common areas operating daily,…
Our Lady of Peace Seminary

Our Lady of Peace Seminary

Our Lady of Peace Seminary Religious seminary and educational institution for clergy formation System Size: 40.40 kWp Completion: 20-Nov-2024 San Isidro, Tarlac City, Philippines Project Summary Seminaries operate on donations and institutional budgets that don’t grow with electricity tariffs. For Our Lady of Peace Seminary in San Isidro, Tarlac City,…
RYECO Building

RYECO Building

RYECO Building Owner-Operated Building With Admin Offices System Size: 17.08 kWp Completion: 30-Jun-2025 Tarlac City, Philippines Project Summary This building serves as the main base of operations for a local business, with the owner’s office and administrative staff situated on the upper floors. The ground level supports day-to-day commercial activity,…
BHF Applicances

BHF Appliances

BHF Appliances Appliance Retailer with Multi-Store Rollout System Size: 16.92 kWp Completion: 1-May-2014 Tarlac City, Tarlac, Philippines Project Summary BHF Appliances is a well-established retail brand with branches across the city and provincial centers throughout Northern Luzon. As an early solar PV adopter, the company recognized that its retail model…
KKK Care

KKK Care

KKK Care Growing regional gasoline station chain System Size: 50.02 kWp Completion: 10-Feb-2026 Tarlac City, Philippines Project Summary KKK Care is a fuel, convenience retail, and QSR site where demand comes from refrigeration,lighting, digital POS systems, canopy and forecourt loads, and back-of-house equipment. Thoseloads follow operating hours, which makes the…
BHF Appliances

BHF Appliances Guimba

BHF Appliances Appliance Retailer with Multi-Store Rollout System Size: 16.92 kWp Completion: 16-May-2013 Guimba, Nueva Ecija, Philippines Project Summary BHF Appliances in Guimba became the first major retailer in the province to integrate solar energy across its operations. At a time when commercial solar adoption was still limited, this move…
BHF Appliances, Gapan

BHF Appliances, Gapan

BHF Appliances, Gapan Appliance Retailer and Pawnshop System Size: 14.17 kWp Completion: 29-Dec-2022 Gapan, Nueva Ecija, Philippines Project Summary BHF has been running solar across its Northern Luzon network long enough to know exactly what it delivers. When the Gapan branch needed a system, the decision was straightforward: the same…
Pure and Pam

Pure and Pam

Pure and Pam Electrical Contractor Yard + Warehouse System Size: 16.50 kWp Completion: 13-May-2015 Mexico, Pampanga, Philippines Project Summary An electrical contractor running a warehouse, equipment yard, and administration offices knows exactly what good electrical installation looks like. Pure and Pam in Mexico, Pampanga works with electrical systems daily. When…
Miranda's Residence

Miranda’s Residence

Miranda’s Residence VIP Residence Premium Grid-Tied Solar Installation with zero billing System Size: 13.08 kWp Completion: 29-Sep-2022 San Sebastian, Tarlac, Philippines Project Summary For a well-known personality in San Sebastian, Tarlac, the decision to install solar was straightforward: protect a premium home from rising grid costs while using the best…
Dr Farrah

Dr Farrah

Dr. Farrah Natural Medical Center – Herbal Clinic + Solar System Size: 16.20 kWp Completion: 3-May-2017 Victoria, Tarlac, Philippines Project Summary The Natural Medical Center of Dr. Farrah provided integrative healthcare services in a rural setting where grid reliability was inconsistent. Treatment rooms, herbal preparation areas, cooling systems, and administrative…
O'Driscoll Residence

O’Driscoll Residence

O’Driscoll Residence Grid-Tied Solar Setup with Night-Time Export Credit System Size: 14.17 kWp Completion: 1-Jul-2023 Tarlac City, Philippines Project Summary For expatriates living in the Philippines, the electricity bill is often the first financial surprise. Grid rates that are among the highest in Southeast Asia hit hardest when you are…
Sinio Residence

Sinio Residence

Sinio Residence Premium Solar Home System Size: 6.50 kWp Completion: 1-Jul-2023 Maliwalo, Tarlac City, Philippines Project Summary This compact residential installation in Tarlac City was one of our earlier SMA-based systems and required careful engineering from the outset. The primary challenge was partial roof shading caused by nearby structures and…
Belmonte Residence

Belmonte Residence

Belmonte Residence Premium Plus Grid Tied Residential Solar System Size: 13.08 kWp Completion: 10-May-2022 Maliwalo, Tarlac, Philippines Project Summary The Belmonte Residence was designed from the outset with integrated solar planning as part of the construction process. Rather than treating solar as an afterthought, the homeowners involved Solaren during the…
Defuntorum

Defuntorum

Defuntorum Grid-Tied Solar Setup with Night-Time Export Credit System Size: 10.62 kWp Completion: 6-Aug-2017 Anubu, Imus, Cavite, Philippines Project Summary For a new build home in Imus, Cavite, the decision was made early: design solar in from the start rather than retrofit it later. That single choice made the installation…
Jorisan Hotel

Jorisan Hotel

Jorisan Hotel Beach Resort with Hotel Annex System Size: 14.00 kWp Completion: 13-Apr-2022 Bauang, La Union, Philippines Project Summary Jorisan Hotel is a beachfront resort in Bauang, La Union, welcoming guests to one of the most exposed coastal environments in Northern Luzon. Like most seaside hotels, energy demand is constant.…
Villa Verde

Villa Verde

Villa Verde Grid-Tied Solar in Gated Community System Size: 11.20 kWp Completion: 20-Apr-2018 Pasig City, Philippines Project Summary Running a home in a gated community in Pasig City means carrying Manila electricity rates on a continuous basis. For the Villa Verde residence, that cost has not been a concern since…
Sytu Residence

Sytu Residence

Sytu Residence Subdivision residence equipped with a full offset solar setup ensuring consistent zero monthly electricity cost. System Size: 6.54 kWp Completion: 30-Sep-2022 Camella, Tarlac City, Philippines Project Summary This modern subdivision residence operates on a full-offset Solaren single-phase solar installation engineered to achieve genuine zero billing under net metering.…
Dunkin Donuts

Dunkin Donuts

Dunkin Donuts Donut Factory + Retail Stores – Multiple Sites System Size: 11.00 kWp Completion: 12-Mar-2019 Sta Maria, Bulacan, Philippines Project Summary A Dunkin’ Donuts operation is not a simple retail store. Behind the counter is a production facility running ovens, refrigeration, and distribution infrastructure that supplies an extended chain…
BHF Bank

BHF Bank

BHF Bank Branch Banking Location Solarized System Size: 11.00 kWp Completion: 29-Nov-2014 Tarlac City, Tarlac, Philippines Project Summary A bank branch cannot afford power interruptions. Bank Operations, online infrastructure, air conditioning, and lighting run continuously across every banking hour, and the electricity bill reflects that. For BHF Bank in Tarlac…
DPJ

DPJ

DPJ Hydro Electric Plant with Solar-Hybrid Concept System Size: 10.80 kWp Completion: 6-Jun-2017 Tabuk, Kalinga, Philippines Project Summary Most renewable energy installations solve one problem. The DPJ project in Tabuk, Kalinga, solves two simultaneously, and each solution makes the other more effective.   The site draws power from a run-of-river…
Limsui Residence

Limsui Residence

Limsui Residence X System Size: 21.96 kWp Completion: 18-Jun-2025 Bamban, Tarlac, Philippines Project Summary A brand new luxury residence in Bamban, Tarlac presented an installation challenge that most solar contractors would have solved the wrong way. The main house sits deep within the property, and running cables from a rooftop…
Aguda Residence

Aguda Residence

Aguda Residence Grid-Tied Solar with Full Daytime Offset System Size: 10.50 kWp Completion: 18-Mar-2023 White Plains, Quezon City, Philippines Project Summary Not every solar installation is a rooftop job. At the Aguda residence in White Plains, Quezon City, the brief called for something more considered: a pergola-mounted system that integrates…
MDC Crescendo

MDC Cresendo

MDC Cresendo Property Development / Commercial System Size: 9.81 kWp Completion: 30-Aug-2023 Luisita, Tarlac, Philippines Project Summary MDC Cresendo forms part of Ayala Land’s major township development in Luisita, Tarlac. As the operational headquarters overseeing planning, logistics, and project coordination for the expanding Cresendo estate, the site office supports continuous…
Corrinthian

Corrinthian

Corrinthian German Solar Premium Grid Tied System Size: 5.50 kWp Completion: 1-Oct-2024 Corinthian Gardens, Quezon City, Philippines Project Summary This installation represents one of Solaren’s early fully German grid-tied systems, deployed on a premium residence within one of the National Capital Region’s most established subdivisions. At the time, residential solar…
Mooney Residence

Mooney Residence

Mooney Residence Hybrid Home System with Battery Storage System Size: 8.12 kWp Completion: 1-Apr-2025 Hacienda Luisita, Philippines Project Summary The Mooney Residence sits on a prime golf course property and required a system that matched both the architectural standard and the lifestyle of its owner. The brief was clear: maximise…
Quirino Residence

Quirino Residence

Quirino Residence Newly constructed home designed with an integrated zero-bill solar system from day one. System Size: 6.54 kWp Completion: 28-Oct-2023 Villa Perpetua, Tarlac City, Philippines Project Summary This newly built residence was designed from the ground up with solar integration as a core part of the architectural and electrical…
Cooper Residence

Cooper Residence

Cooper Residence Retirement home running on a zero-bill solar system built for reliability and long-term comfort. System Size: 10.90 kWp Completion: 25-Sep-2023 Caut, La Paz, Philippines Project Summary This retirement residence was engineered to deliver full daily offset and stable long-term performance for a newly retired couple relocating from the…
Domingo

Domingo Residence

Domingo Residence Grid-Tied Solar Home with Full Offset System Size: 7.63 kWp Completion: 11-Oct-2023 Hacienda Luisita, Philippines Project Summary A home on the fairways of Hacienda Luisita carries a certain set of expectations. For the Domingo residence, one of those expectations is now a zero electricity bill — not just…
KKK Gasoline, Baculong

KKK Gasoline, Baculong

KKK Gasoline, Baculong Fuel station with commercial rental spaces System Size: 10.01 kWp Completion: 15-Oct-2024 Victoria, Tarlac, Philippines Project Summary Running a fuel station with commercial rental spaces means carrying two sets of operating costs. KKK Gasoline in Baculong, Victoria, Tarlac manages both: forecourt operations plus tenant businesses sharing the…
Mazure Residence

Mazure Residence

Mazure Residence Premium Hybrid System for complete selp dependency System Size: 15.60 kWp Completion: 21-Jan-2026 Tagudin, Ilocos Sur, Philippines Project Summary Mr. Mazure selected a premium British-engineered solar and storage solution designed for full residential resilience in an area known for unstable and unpredictable grid supply. Rather than installing a…
Goodno Residence

Goodno Residence

Goodno Residence Hybrid solar with battery backup for essential home loads System Size: 12.80 kWp Completion: 16-Jan-2026 Laur, Nueva Ecija, Philippines Project Summary This premium residential installation uses a high-capacity hybrid inverter with battery backup to support critical household loads needed for medical purposes, such as essential medical equipment, refrigeration,…
Linda Gray

Gray’s Residence

Gray’s Residence Grid-Tied Solar for Provincial Household System Size: 7.63 kWp Completion: 7-Jul-2024 Luna, La Union, Philippines Project Summary For a retired expatriate settling permanently in Luna, La Union, the electricity brief was straightforward: significant savings, long-term reliability, and a system built to last without constant attention. Northern Luzon grid…
Murray

Murray Residence

Murray Residence Grid-Tied Solar Home with Full Offset System Size: 7.00 kWp Completion: 20-Jan-2022 Mexico, Pampanga, Philippines Project Summary The Murray residence sits in Mexico, Pampanga, with Mount Arayat as its backdrop, one of the more distinctive addresses in Central Luzon. Since January 2022, it has also been one of…
Daviau

Daviau Residence

Daviau Residence Modern Class A Grid-Tied Solar Family System with zero billing System Size: 6.68 kWp Completion: 4-Dec-2020 Tagudin, Ilocos Sur, Philippines Project Summary For an expatriate family spending six months of the year abroad, a standard grid-tied solar system would generate energy with nobody home to use it. Without…
Luchangco Residence

Luchangco Residence​

Luchangco Residence Premium grid-tied solar installation delivering stable daytime power and long-term savings. System Size: 6.93 kWp Completion: 2-Sep-2021 Tarlac City, Philippines Project Summary This premium grid-tied residential installation was engineered to eliminate rising electricity costs and deliver stable, long-term performance. The homeowner, a retired balikbayan supporting extended family members…
MBP Blessed Trinity

MBP Blessed Trinity

MBP Blessed Trinity Private Hospital Rooftop System System Size: 5.70 kWp Completion: 10-Nov-2015 Mangatarem, Pangasinan, Philippines Project Summary Hospitals cannot afford power interruptions. For MBP Blessed Trinity in Mangatarem, Pangasinan, electricity supports medical equipment, patient comfort, and round-the-clock service delivery. When the hospital chose solar in November 2015, reliability was…
Albano

Albano

Albano Grid-Tied Solar with Full Daytime Offset System Size: 11.00 kWp Completion: 13-May-2015 San Fernando, Pampanga, Philippines Project Summary When an electrical engineering contractor builds a new home, every system specification is a professional decision. There is no sales process to navigate, just a technical evaluation of what works and…
Hansen

Hansen’s Residence

Hansen’s Residence Legacy Grid-Tied Home Solar – Fully Operational System Size: 5.52 kWp Completion: 20-Jul-2012 Sta Monica Heights, Tarlac City, Philippines Project Summary For a retired family in Sta. Monica Heights, Tarlac City, electricity bills on a fixed income are not a minor inconvenience. They are a monthly pressure that compounds…
Mooney

Mooney

Mooney Hybrid Home System with Battery Storage System Size: 8.12 kWp Completion: 1-Apr-2025 Hacienda, Luisita, Philippines Project Summary A premium hybrid system built to ensure uninterrupted day and night energy use, with advanced storage and seamless switchover. System Performance System Size: 8.12 kWp Annual Generation: 11,977 kWh Day Peak Load:…
Tanedo Residence

Tanedo Residence

Tanedo Residence City-center home powered by a fully self-reliant grid-tied solar system that eliminates monthly bills. System Size: 5.40 kWp Completion: 2-Mar-2017 Gerona, Tarlac City, Philippines Project Summary Retirement should mean financial stability, not monthly anxiety over electricity bills. For the Tañedo family in the city center, rising grid rates…
Sustansiya, Philippines

Sustansiya, Philippines

Sustansiya, Philippines Agribusiness and bio-fertiliser production company with farm operations System Size: 23.94 kWp Completion: 3-Dec-2024 Anao, Philippines, Philippines Project Summary Sustansiya Philippines runs a circular agribusiness model: converting poultry manure into bio-fertiliser while managing adjacent farm operations in Anao, Tarlac. It is exactly the kind of business where power…
Inainakay Foundation

Inainakay Foundation

Inainakay Foundation Nonprofit organization providing education and family support for disadvantaged children and communities System Size: 17.98 kWp Completion: 20-Apr-2024 Sula, San Jose, Philippines Project Summary Ina-Inakay Foundation supports children and families of women in difficult circumstances, including those affected by incarceration. Located in a remote area of San Jose,…
PLERM Construction

PLERM Construction

PLERM Construction Construction and civil engineering contractor, JICA partner System Size: 11.00 kWp Completion: 23-May-2015 Santa Maria, Bulacan, Philippines Project Summary Construction companies run heavy electrical loads in site offices, fabrication equipment, lighting across large facilities  and Plerm Construction’s monthly utility bills reflected that. As one of Bulacan’s longest established…
Albano Residence

Albano Residence

Albano Residence Premium Residential Solar Installation System Size: 5.49 kWp Completion: 5-Jan-2025 Angeles City, Philippines Project Summary Solaren designed and installed a high-efficiency residential solar power system for the Albano Residence, a modern home located in a premium subdivision, integrating the system cleanly into the roof design to support daytime…
KKK Gasoline, San Rafael

KKK Gasoline, San Rafael

KKK Gasoline, San Rafael Gasoline Station and commercial space System Size: 10.01 kWp Completion: 6-Jun-2024 Tarlac City, Philippines Project Summary Fuel station canopies present a solar installation challenge that most contractors avoid. The structural loading requirements, fire safety compliance, and electrical routing across a working forecourt demand a level of…
BHF Appliances, Camiling

BHF Appliances, Camiling

BHF Appliances, Camiling Multi-Store Appliance Retailer System Size: 9.90 kWp Completion: 29-Jun-2015 Camiling, Tarlac, Philippines Project Summary BHF Appliances in Camiling marked one of the company’s earliest commercial solar PV installations, reinforcing its position as an early adopter of renewable energy in Northern Luzon. As a long-established appliance retailer, BHF…
KKK Gasoline, Padapada

KKK Gasoline, Padapada

KKK Gasoline, Padapada Gasoline Forecourt with Retail Spaces System Size: 10.01 kWp Completion: 25-Jun-2024 Sta Ignacia, Tarlac, Philippines Project Summary Sta. Ignacia sits in the heart of Tarlac, and the Padapada station serves a local community that KKK has built a long-standing retail presence in. Running fuel pumps, cooling systems,…
BHF Appliances, Paniqui

BHF Appliances, Paniqui

BHF Appliances, Paniqui Retail Appliances and Warehouse Facility System Size: 9.90 kWp Completion: 6-Jun-2015 Paniqui, Tarlac, Philippines Project Summary Retail appliance stores run continuous daytime loads: lighting across large display areas, cooling systems, demonstration equipment, and point-of-sale infrastructure. For BHF Appliances in Paniqui, Tarlac, the consumption across multiple locations was…
BHF Appliances, F. Tañedo

BHF Appliances, F. Tañedo

BHF Appliances, F. Tañedo Appliance Showroom and Retail Center System Size: 11.00 kWp Completion: 29-Nov-2014 Tarlac City, Philippines Project Summary BHF Appliances on F. Tañedo Street in Tarlac City was one of the first commercial clients to trust Solaren with a solar installation. That was November 2014. The system is…
Conception Residence

Concepcion Residence

Conception Residence A newly built retirement villa outside the city designed for comfort and self-sufficient solar living. System Size: 17.98 kWp Completion: 2-May-2024 Mababanaba, San Jose, Philippines Project Summary This brand-new retirement villa outside the city was designed from the outset for quiet living and long-term energy stability. Solar integration…
KKK Gasoline, Gerona

KKK Gasoline, Gerona

KKK Gasoline, Gerona Service Station with Food and Retail Outlets System Size: 10.01 kWp Completion: 6-Jun-2024 Gerona, Tarlac, Philippines Project Summary A fuel station with food and retail outlets is not a simple electrical brief. Refrigeration units run continuously regardless of trading hours, cooling loads vary with customer footfall, and…
KKK Gasoline, Strada

KKK Gasoline, Strada

KKK Gasoline, Strada Fuel Station and Roadside Commercial Complex System Size: 10.01 kWp Completion: 11-Jul-2024 Capas, Tarlac, Philippines Project Summary Roadside commercial complexes along major routes in Central Luzon carry a specific energy challenge: operations run continuously, tenants have varying consumption patterns, and the site never fully powers down. At…
KKK Gasoline, Amucao

KKK Gasoline, Amucao

KKK Gasoline, Amucao Gasoline Station 24/7 in prime location System Size: 10.01 kWp Completion: 29-May-2024 Tarlac City, Philippines Project Summary The Amucao branch occupies a prime location in Tarlac City with 24-hour operations and a planned 7-Eleven tenant addition. That last detail shaped the engineering brief from the start. Rather…
KKK Gasoline, Maliwalo

KKK Gasoline, Maliwalo

KKK Gasoline, Maliwalo Commercial / Retail Fuel Station Solar Installation System Size: 12.00 kWp Completion: 29-Jul-2025 Maliwalo, Tarlac, Philippines Project Summary Fuel station economics leave little room for controllable costs to go uncontrolled. The KKK network serves motorists and local businesses across Central Luzon, with each site running pumps, lighting,…

BIR TAX CLEARANCE CERTIFICATE

A BIR Tax Clearance Certificate is issued by the Bureau of Internal Revenue and confirms that Solaren Renewable Energy Solutions Corporation has no outstanding tax liabilities and is fully current with all income and business tax obligations. This certificate is valid until 16 March 2027.
Under Executive Order No. 398 and the Government Procurement Reform Act (RA 9184), this clearance is a legal requirement for any contractor participating in government projects or bidding processes. It is a continuing obligation for the duration of any government contract. A contractor without a valid tax clearance cannot settle government contracts or receive final payment for completed works.
For private sector clients, this certificate signals something equally important. Solaren is a financially compliant, properly registered business with clean tax standing. In a sector where fly-by-night and hit-and-run operators are not uncommon, this is verifiable proof that Solaren is built for the long term. That distinction matters when our customers are committing to a 25-year asset.

KIM BRYAN C. LUSUNG

Project Electrical Engineer

Bryan brings a disciplined engineering background to Solaren’s project execution team, taking direct responsibility for on-site electrical works and individual project cycles from mobilisation through to commissioning. A Registered Electrical Engineer and Registered Master Electrician with a Master’s degree in Electrical Engineering (Power Systems) from Tarlac State University, he combines strong academic grounding with practical field experience across commercial construction, multi-site energy management, and solar PV maintenance and performance monitoring with a leading Philippine EPC. His prior exposure to solar plant operations gives him a working understanding of how installation decisions affect long-term system performance, which informs the quality of his on-site execution at Solaren.

Key Responsibilities

• Lead on-site electrical installation and project execution
• Manage individual project cycles from mobilisation to commissioning
• Ensure all electrical works conform to approved designs and Philippine Electrical Code standards
• Coordinate with the project management team on progress, timelines, and technical issues
• Support testing, energization, and formal turnover

BIR 2303

The BIR Certificate of Registration, also known as BIR Form 2303, is issued by the Bureau of Internal Revenue and confirms that Solaren Renewable Energy Solutions Corporation is a fully registered taxpaying business entity in the Philippines. This document establishes that Solaren operates transparently within the Philippine tax system, issues official receipts, and complies with national revenue regulations. For clients commissioning solar installations, working with a BIR-registered company matters. It protects you legally, ensures that payments are properly receipted, and confirms that the contractor you are dealing with is a legitimate, accountable business. Many informal or underqualified installers operate without proper tax registration. Solaren’s BIR registration is current, publicly verifiable, and forms part of the baseline compliance documentation we maintain alongside all other government accreditations.

BUREAU OF CUSTOMS REG 2025-2026

Solaren’s Bureau of Customs registration for 2025 to 2026 confirms our authorization to import solar equipment directly into the Philippines. This registration is significant for clients who want assurance that the hardware installed on their property has been sourced, declared, and cleared through official channels. Direct importation means Solaren has full visibility over the supply chain, from manufacturer shipment to local delivery. It eliminates the risks associated with undeclared, gray market, or improperly handled equipment that can affect warranty validity and long-term performance. Solaren sources panels, inverters, and battery systems from verified international manufacturers and processes all shipments through proper customs documentation. This registration is renewed annually and reflects our ongoing commitment to transparent, compliant procurement on behalf of every client we serve.

PHILIPPINE BOARD OF INVESTMENTS

Solaren’s Board of Investments registration confirms our standing as a recognized participant in the Philippines’ renewable energy sector under the national investment framework. BOI registration is granted to companies that meet specific criteria related to industry classification, capital structure, and compliance with Philippine investment law. For Solaren, this registration reflects our role as an established solar energy company operating within the country’s broader push toward clean energy development. It is a mark of institutional recognition that distinguishes properly structured solar companies from informal operators. Clients working with BOI-registered contractors can be confident they are dealing with a company that has been assessed at the national investment level, not just at the local licensing level. This credential is part of the complete compliance profile Solaren maintains across all relevant government agencies.

VIA MEMBERSHIP CERTIFICATE

Dun and Bradstreet is one of the world’s most recognized business verification and credit intelligence organizations. A Dun and Bradstreet listing confirms that Solaren has been independently verified as a legitimate, operating business entity with a traceable commercial history. This credential is particularly relevant for corporate clients, multinational companies, and procurement teams that require suppliers to meet international due diligence standards before awarding contracts. Many large organizations require a D&B listing as part of their vendor accreditation process. Solaren’s inclusion in the Dun and Bradstreet registry reflects our standing as a professionally structured company with a documented business history. It adds an internationally recognized layer of verification to our local government accreditations and reinforces Solaren’s credibility for clients operating at an enterprise or institutional level.

DEPARTMENT OF ENERGY REGISTRATION

The Department of Energy accreditation is the most direct and authoritative confirmation that Solaren is a qualified solar contractor in the Philippines. The DOE does not accredit companies based on self-declaration. Accreditation requires demonstrated technical capability, proper licensing, qualified personnel, and a verifiable track record of completed installations. For any homeowner or business commissioning a solar project, DOE accreditation should be a baseline requirement when evaluating contractors. It is the government’s own confirmation that the company you are hiring meets the national standard for solar installation work. Solaren has maintained DOE accreditation throughout our operating history and renews it through the standard assessment process. This certificate is one of the most important documents on this page and one of the first things any serious buyer should ask to see before signing a contract.

VIA MEMBERSHIP CERTIFICATE

Dun and Bradstreet is one of the world’s most recognized business verification and credit intelligence organizations. A Dun and Bradstreet listing confirms that Solaren has been independently verified as a legitimate, operating business entity with a traceable commercial history. This credential is particularly relevant for corporate clients, multinational companies, and procurement teams that require suppliers to meet international due diligence standards before awarding contracts. Many large organizations require a D&B listing as part of their vendor accreditation process. Solaren’s inclusion in the Dun and Bradstreet registry reflects our standing as a professionally structured company with a documented business history. It adds an internationally recognized layer of verification to our local government accreditations and reinforces Solaren’s credibility for clients operating at an enterprise or institutional level.

PCAB LICENSE 2025-2026

The Philippine Contractors Accreditation Board license is a legal requirement for any contractor performing electrical and construction work in the Philippines. Solaren holds a current PCAB license for 2025 to 2026, which confirms that our company meets the technical, financial, and organizational requirements set by the Construction Industry Authority of the Philippines. Working with an unlicensed contractor exposes clients to legal risk, voided permits, and installations that cannot pass government inspection. PCAB licensing ensures that the contractor has qualified personnel, proper bonding, and a track record that has been assessed by the relevant regulatory body. For solar installations that involve rooftop structural work, electrical systems, and grid connection, this license is not optional. It is a legal baseline, and Solaren maintains it without interruption as part of our standard compliance obligations.

Philgeps Solaren 2026

PhilGEPS, the Philippine Government Electronic Procurement System, is the official registry for suppliers authorized to participate in government procurement. Solaren’s PhilGEPS registration for 2026 confirms that we meet the documentary and compliance requirements set by the national government for accredited suppliers. This registration is relevant not only for government projects but as a general trust signal. The PhilGEPS accreditation process requires verified business registration, tax compliance, and proper licensing documentation. Companies that cannot pass this process are not eligible to work with government agencies, state universities, or publicly funded institutions. Solaren’s active registration confirms that our documentation is complete, current, and has passed independent government review. For any client, public or private, this is additional confirmation that Solaren operates as a fully compliant and accountable solar contractor.

Securities and Exchange Commission Registration

Solaren Renewable Energy Solutions Corporation is registered with the Securities and Exchange Commission of the Philippines, confirming our legal existence as a domestic corporation under Philippine law. SEC registration establishes the company’s corporate structure, confirms the identity of incorporators and directors, and places the company within the formal regulatory framework governing Philippine corporations. For clients, this means you are dealing with a properly constituted legal entity that can be held accountable, can enter into enforceable contracts, and has a verifiable corporate history. Many informal solar operators function as sole proprietorships or unregistered partnerships with limited legal accountability. Solaren’s SEC registration is part of the foundation that makes us a dependable long-term partner. It is publicly verifiable through the SEC’s online registry and has been in place since Solaren was founded in 2014.

SOLAREN BUSINESS PERMIT 2026

Solaren’s local government business permit for 2026 confirms that our operations are fully authorized by the relevant local government unit. Business permits are renewed annually and require compliance with local ordinances, zoning regulations, and tax obligations at the municipal level. While a business permit may seem like a basic credential, its absence is a red flag. Contractors operating without a current permit are not legally authorized to conduct business in that jurisdiction. For clients in Central Luzon and surrounding regions, this permit confirms that Solaren is a locally rooted, properly authorized business, not a transient operator with no fixed accountability. Combined with our national accreditations, DOE registration, and SEC incorporation, this permit completes the full picture of a solar company that operates transparently at every level of government oversight.

Ayala Land Accreditation Certificate

Ayala Land is one of the Philippines’ most respected property developers, and their accreditation process for solar contractors is rigorous. Being an Ayala Land accredited solar installer means Solaren has passed assessment across licensing, engineering standards, insurance requirements, safety compliance, and track record. Developers of Ayala Land’s standing do not accredit contractors lightly. Their projects involve premium residential and commercial properties where installation quality directly affects property value and tenant satisfaction. Solaren’s accreditation confirms that our technical standards, documentation, and project execution meet the requirements set by one of the country’s most demanding real estate organizations. For clients in Ayala-developed communities or those who simply want assurance that their contractor has been vetted by a credible third party, this accreditation is a meaningful signal of quality and reliability.

installation teams

Solaren’s in-house installation teams deliver commercial and industrial solar projects with the consistency and precision that large sites demand. With several trained crews operating across the Philippines, we handle multiple installations simultaneously while maintaining high, uniform workmanship standards. Each team works closely with Solaren’s engineers to plan structural layouts, optimize wiring routes, position inverters for optimal performance, and integrate the system safely into the client’s existing electrical network. This level of coordination ensures clean execution on the roof and inside the facility, with every detail checked against strict safety and performance requirements. Our teams are experienced with complex environments, from homes to factories and warehouses, showrooms and food-production sites, and they follow a disciplined workflow that protects system performance for years. Because all installation work is performed by Solaren personnel, not subcontractors, clients receive complete accountability, better quality control, and systems built to deliver reliable energy from the day of commissioning.

JERRICO MIGUEL

Junior Electrical Engineer

Jerrico assists with electrical installation, testing, and commissioning across commercial PV systems. With 3 years of engineering experience, he supports senior engineers with wiring, system validation, and integration of monitoring systems. He has contributed to deployments for food manufacturing, warehousing, and commercial facilities.

Key Responsibilities

• Assist with wiring, conduit work, and panel installation
• Support testing, commissioning, and on-site validation
• Perform basic electrical troubleshooting and checks
• Document as-built work and site conditions
• Coordinate with senior engineers for daily tasks

ARNOLD NICOLE YOUNG

IT Specialist

Arnold manages and oversees Solaren’s IT infrastructure, Networking and monitoring platforms. With over seven years of IT and network experience, he maintains monitoring for hundreds of live systems nationwide, ensuring uptime, data security, and reliable performance visibility. He is CCNA-certified.  Arnold is responsible for coordinating the operations and maintenance of existing systems,

Key Responsibilities

• Manage O and M, monitoring portals and system dashboards
• Maintain IT networks and data security protocols
• Support engineers with diagnostics and remote checks
• Ensure uptime of client monitoring portals
• Implement updates and coordinate hardware integration

JOHN RUDOLF SIGUA

PV Design Engineer

John specializes in system modelling, layout design, and performance simulation for commercial and industrial projects. A Registered Electrical Engineer with five years of design experience, he works with PVsyst, AutoCAD, and utility-compliant PEC standards. He supports commissioning and troubleshooting to ensure accurate performance and reliable operation.

Key Responsibilities

• Prepare PV system layouts, modelling, and energy simulations
• Size components for optimal performance and compliance
• Produce design packages for permitting and construction
• Support commissioning, technical checks, and system validation
• Provide troubleshooting for design-related issues

EJ P. ERESE

Project Manager | Senior Electrical Engineer

EJ manages full project life cycles for Solaren’s commercial and industrial installations, from design coordination and procurement through to commissioning and client turnover. A Registered Electrical Engineer, Registered Master Electrician, and Safety Officer 2, he brings six years of hands-on field experience across some of Solaren’s most demanding deployments, including the Oishi and Toyota projects, and has supervised crews on multiple multi-MWp systems with a flawless safety record. His combination of technical depth and site-level discipline makes him one of the most capable project managers operating in the Philippine solar EPC space.

Key Responsibilities

• Manage full project life cycles across commercial and industrial PV systems
• Lead engineering coordination, crew assignments, and on-site execution
• Enforce safety compliance and conduct toolbox meetings
• Track progress, manage timelines, and maintain client communication
• Validate installation work against approved designs
Oversee testing, energization, and formal project turnover

CARLO BENJAMIN NUCUM

Senior Project Manager

Carlo has long led the company’s engineering teams across full project lifecycles, from planning to commissioning. He has delivered multi-MWp systems for clients such as Liwayway Marketing, Bench, Toyota, New Zealand Creamery, and Atlantic Grains. A Registered Electrical Engineer with more than eight years of experience, he manages and oversees PEC-compliant installations and quality control across commercial and industrial sites.

Key Responsibilities

• Lead project teams and manage end-to-end delivery in entirety
• Oversee installation quality, safety, and technical compliance
• Coordinate with clients, suppliers, and engineering groups
• Review electrical plans and validate system performance
• Supervise testing, commissioning, and turnover documentation

Christopher Henry Hutchings

Sales Director

Chris brings four decades of international finance experience, including senior leadership roles in Hong Kong where he still qualifies as a Responsible Officer under the Hong Kong Securities and Exchange Commission requirements. His background in Private Wealth, managing client portfolios and evaluating long-term financial strategies allows him to help enterprise clients assess solar investments with clarity and confidence. Chris leads Solaren’s commercial sales strategy, working with clients to structure accurate proposals, reliably analyses return expectations, and build sustainable partnerships. He collaborates closely with engineering and procurement teams to ensure every system is designed, priced, and projected with precision.

Key Responsibilities

• Leadership of enterprise and commercial sales strategy
• Client advisory on ROI, system design, and financial planning
• Proposal development with engineering and procurement teams
• Partnership building across commercial and industrial sectors
• Risk and value assessment for large-scale solar investments
• Reliable and trusted representation of Solaren in high-level client engagements and negotiations

Ronnie C. Lorenzo

General Manager & Corporate Secretary

Ronnie manages Solaren’s day-to-day operations, coordinating procurement, logistics, manpower, and documentation across all active project sites. He supervises regulatory submissions, contract execution, and local permitting to ensure every deployment remains compliant and on schedule. His critical role connects engineering, procurement, and administrative teams so projects move efficiently from planning to installation and commissioning. As Corporate Secretary, he maintains board records, supports executive reporting, and ensures transparency across the company’s internal processes and external commitments.

Key Responsibilities

• Daily operations, scheduling, and logistics
• Procurement coordination and supplier management
• Contract execution and regulatory submissions
• On-site documentation and compliance tracking
• Cross-team coordination from planning to commissioning
• Corporate Secretary duties and board record management

Anicia Pearce

President

Ann leads corporate governance, financial discipline, and regulatory compliance for Solaren, ensuring full alignment with the companies ever growing regulatory requirements. She manages audit readiness, internal controls, and risk management across all departments. Her work anchors the company’s expanding operations, providing clear structures for procurement, contracting, and documentation. Ann also oversees systems that ensure complete records and proper regulatory filings support each project from planning to commissioning. Her no-nonsense leadership reinforces Solaren’s credibility with clients, partners, and government agencies as the company continues to handle larger commercial and industrial portfolios.

 

Key Responsibilities

• Corporate governance and regulatory compliance
• Financial controls, budgeting, and audit readiness
• Risk management and operational discipline
• Oversight of contracting, documentation, and procurement workflows
• Alignment with all regulatory and Government standards
• Executive support for cross-department operations

Neil H. Pearce

Managing Director

Neil leads Solaren’s strategic planning and oversees all commercial, financial, and operational decisions across the company’s national portfolio. He brings over three decades of experience across Asia’s financial markets, including his past work and key Directorships for several private wealth management companies in Hong Kong. He guides capital allocation, project evaluation, and long-term planning while strengthening supplier relationships with global partners. Neil has overseen more than 85 MW of commercial, industrial, and residential installations and continues to steer Solaren’s expansion into AI-driven monitoring, energy storage, and enterprise-scale engineering systems. He also serves as a director for several regional companies.


Key Responsibilities

• Strategic direction and long-term planning
• Capital allocation and project funding oversight
• Partnership management with global suppliers
• Corporate governance and executive decision-making
• Evaluation of commercial and industrial project pipelines
• Expansion into energy storage and digital monitoring, together with Artificial Intelligence

Renewable Energy Solutions

GET A QUOTE